Similar Projects
Janitorial
Term Contract
Results
Ketchum, ID 83340

Hartley Sewer Main Project
Alteration
Results
Middleton, ID

Sewage and Sanitation
Term Contract
Design
Ahsahka, ID 83520

Custodial Services
Term Contract
Post-Bid
Hayden, ID 83835

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

2021-2022 Janitorial Services
Alteration
Post-Bid
ID

Ada County Custodial Services
Alteration
Post-Bid
Boise, Garden City, Meridian, Star, ID 83642

North Fork Idaho Janitorial
Term Contract
Post-Bid
North Fork, ID 83466

Professional Custodial Services
Alteration
Post-Bid
Sandpoint, ID 83864

Cleaning Services for Yellowstone Dialysis
Term Contract
Post-Bid
Rexburg, ID 83440

Custodial Services for Certain City Buildings
Term Contract
Post-Bid
Moscow, ID

Emergency COVID-19 Cleaning Services
Post-Bid
San Diego, CA - Dania Beach, Titusville, FL - Bayview, ID - Bethesda, Olney, MD - Philadelphia, PA - Chesapeake, Norfolk, VA - Bangor, WA

Snake River Canyon National Cemetery Janitorial Services Tiered Evaluation
Term Contract
Post-Bid
Buhl, ID 83316

Reported 03/11/2022 12:00 AM
Project Title

2022 City of Montpelier Sewer Line Cleaning and Inspection

Physical Address View project details and contacts
City, State (County) Montpelier, ID   (Bear Lake County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Janitorial/Maintenance, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the CONTRACT DOCUMENTS and as shown on the DRAWINGS. The project consists of cleaning and inspecting the 18” main sewer trunk line along US Highway 89 from 11th Ave. to the head works on Bern Rd. as well as the 12” sewer lateral parallel to Monroe St. and Lincoln St. from 8th Ave. to 11th Ave.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents