Similar Projects
Z--Zion 274111 - Bridge Preservation, Zion National Park
Design
$1,000,000 to $5,000,000 est. value
Springdale, UT 84767

3500 West - Pedestrian Sidewalk and Bridge
New Construction, Infrastructure
Bidding
West Haven, UT

Bridge Deck Repair on I-15
Post-Bid
Cedar City, UT 84720

West Cache Canal Screening Project
Post-Bid

State Street Pedestrian Bridge Removal
Results
Murray, UT 84107

Bull Valley Gorge Bridge Repair
Results
Less than $118,750 est. value
Kanab, UT

Traffic Rated Canal Bridge Crossings
New Construction
Post-Bid
Price, UT

Jordan River Trail Bridges
Results
West Jordan, UT 84088

Community Development - Rowley Road Bridge Replacement
Renovation
Post-Bid
Millcreek, UT 84107

SR-65; Henefer Bridge Rehabs, C-566 and D-772 Replacement and Rehabilitation - Structure
Results
$10,000,000 to $15,000,000 est. value
UT

U Of U Helix Bridge Structural Steel
New Construction, Term Contract - 450 SF
Post-Bid
Salt Lake City, UT

Promised Land Bridge
Results
Less than $220,000 est. value
Duchesne, UT 84021

Devils Slide Bridge, Near Croydon - Rehabilitation or Replacement
New Construction
Post-Bid
$1,500,000 to $3,000,000 est. value
UT

Wildwood Bridge Reconstruction
Results
Ogden, UT 84401

Wasatch County Water Efficiency Project - Wasatch Canal Lining - Mill Road Bridge Replacement
Renovation, Infrastructure, Alteration
Post-Bid
Heber City, UT 84032

Last Updated 10/07/2021 07:21 AM
Project Title

DFCM Construction - Division of Wildlife Resources Hatt's Ranch Bridge Repairs

Physical Address View project details and contacts
City, State (County) Green River, UT   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $102,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Hatt’s’s Ranch Bridge and abutment was damaged by a fire. The entire abutment was damaged and approximately 1/3 of the timber bridge elements including the first support trellis were damaged. The abutment, the first span timber stringers, deck and first support trellis are to be removed and replaced

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents