Similar Projects
Sunnyside Kitchen A/C 2021
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28312

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Job Order Contract for HVAC Installation and Repair
Term Contract
Results
Fayetteville, NC 28302

Pine Forest Middle School Building 3 HVAC Renovation
Results
Fayetteville, NC 28311

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Furnish and Deliver Trenton Products Walk-In Cooler and Freezer Systems
Results
Less than $14,397 est. value
Bonnie Doone, NC 28303

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Chiller Replacement at Bill Hefner Elementary
Results
Fayetteville, NC 28314

Phase 2 Classroom HVAC Upgrade at South View Middle School
Post-Bid
Less than $500,000 est. value
Hope Mills, NC 28348

Westover Middle School Cooling Tower Replacement
Results
Fayetteville, NC 28303

Phase 1 HVAC Replacement Ramsey Street High School
Post-Bid
Fayetteville, NC 28301

Seventy-First High School Chiller Replacement
Results
Fayetteville, NC 28304

Garage Air System Repair
Alteration
Post-Bid
Fayetteville, NC

Anne Chesnutt Middle School and Morganton Road Elementary School, HVAC Infrastructure
Results
Fayetteville, NC 28303

Last Updated 09/14/2021 04:15 PM
Project Title

Remove and Replace Two Existing A/C Units and One Existing Split System at Mary Mcarthur Elementary School

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28304   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000 to $30,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove and dispose of the two existing package a/c units and one existing split system. The contractor shall supply and install two new 3 ton package heat pumps and one 3 ton split system with thermostats. The contractor shall install three new disconnects with new conduit and power wire from disconnect to the new units. The new units shall match existing equipment’s Btu, voltage and phase. All duct work shall be sealed with mastic

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents