Similar Projects
Blue Bell Distribution
Renovation - 13,775 SF
Conception
Duncan, SC 29334

Ample Storage
Addition - 24,000 SF
Conception
West Columbia, SC 29170

Broadway Self Storage
New Construction - 125,294 SF
Design
$10,000,000 CJ est. value
Mount Pleasant, SC 29464

Zelasko Road Warehouse
New Construction, Build-Out - 5,000 SF
Design
$1,200,000 est. value
Johns Island, SC

Hayne Lab Backup Generator
Alteration
Bidding
$1,500,000 to $1,750,000 est. value
Columbia, SC 29223

Medium Volt Transformers
Alteration
Bidding
Clemson, SC

Generator Preventive Maintenance Services
Term Contract
Post-Bid
Hilton Head Island, SC

MUSC Walton Research Automatic Transfer Switch Replacement
Post-Bid
$200,000 to $400,000 est. value
Charleston, SC 29425

IMCOM Electrical Support Services
Results
Columbia, SC 29207

Replace Elevator Control Panel
Results
Salters, SC 29590

Kershaw County Lab Upfits
Construction
$150,000 to $180,000 est. value
Camden, SC

The Waterfront - Phase 1 Building
New Construction - 16,779 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Daniel Island, SC 29492

Go Storeit
Renovation - 70,729 SF
Conception
Hilton Head Island, SC 29926

Generator Maintenance Services
Term Contract
Bidding
Allendale, Beaufort, Columbia, Eastover, Florence, Greenville, Plum Branch, Sumter, SC 29605

LED Lighting Project for Mauldin High School
Post-Bid
Mauldin, SC 29662

Reported 01/06/2022 12:00 AM
Project Title

Raw Water Pumps/VFD Building Electrical

Physical Address View project details and contacts
City, State (County) Westminster, SC 29693   (Oconee County)
Category(s) Commercial, Single Trades
Sub-Category(s) Electric, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Perform Electrical and Building Construction Services. 1. Provide a steel building situated on a concrete pad. 2. Provide electrical wiring and components for two 300HP VFDs and building. 3. Provide electrical wiring from the VFD building to the Pump Platform. 4. Provide connectivity between VFD building conductors and existing Platform Raw Water Pump conductors.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents