Project Title | WWTP Upgrades and Sanitary Sewer Collection System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Albright, WV (Preston County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers, Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The approximate quantities of work to be bid upon are described as follows: 1 LS Mobilization/Demobilization, 1 LS Portable Generator, 1 LS Erosion and Sediment Controls, 4 EA Type B Manhole Rehabilitation (0 to 6'), 16 VF Type B Manhole Rehabilitation (Greater than 6'), 1 EA Type D Manhole Rehabilitation,1,600 LF Restoration of Disturbed Area, 110 LF Concrete Roadway/Driveway Repair, 900 LF WVDOH Type "B" Trench Repair, 110 LF WVDOH Type "C" Trench Repair, 220 LF Full Width Roadway Crushed Stone Repair, 5,000 LF Videotape Existing 8" Sanitary Sewer Line, 330 LF Videotape Existing 8" Storm Sewer, 220 LF Videotape Existing 24" Storm Sewer, 5,000 LF Clean Existing 8" Sanitary Sewer Line, 330 LF Clean Existing 8" Storm Sewer, 220 LF Clean Existing 24" Storm Sewer, 2,100 LF Remove Existing Service Lateral and Replace with New 4" ASTM D3034 SDR 35 PVC Gravity Sanitary Sewer Lateral (0 - 6' Depth), 140 LF Remove Existing Gravity Sewer Line and Replace with New 8" ASTM D3034 SDR 35 PVC Gravity Sanitary Sewer (0 - 6' Depth), 500 LF Remove Existing Gravity Sewer Line and Replace with New 8" ASTM D3034 SDR 35 PVC Gravity Sanitary Sewer (0 - 6' Depth) at Locations Identified in Cleaning and Videoing by Contractor, 1 LS Upgrades to the Kwik Stop Grinder Station, 1 LS Upgrades to the East End Grinder Station, 1 LS Upgrades to the WVDOH Grinder Station, 1 LS Wastewater Treatment Plant Upgrades, 64 EA Lateral Connection at Wye/Bend and/or Customer Side, 32 EA Lateral Cleanout, 1 EA Remove Utility Pole and Place Along Right-of-Way, 8 EA Connection to Existing 8" PVC Sewer Line, 2 EA Remove Drain Inlet Lid for Inspection, 10 EA Cut and Cap Unused Lateral, 4 EA Cap Cleanout, 110 LF Concrete Sidewalk Repair, 12 EA Test Pit to Locate Existing Lateral, ALLOWANCE for Correcting Drain Inlets to Remove Inflow. |
||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |