Similar Projects
Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

400 East 540 North to Center Street Culinary Waterline
Post-Bid
$250,000 est. value
Centerville, UT

Construction of the 800 West Improvement Project
Results
West Bountiful, UT 84087

2020 Water Line Projects
Results
Less than $1,244,144 est. value
Bountiful, UT 84010

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

Mueller Park Junior High School Waterline Replacement
Results
$350,000 to $500,000 est. value
Bountiful, UT 84010

Clearfield City 10-Inch Waterline Improvement Project on 1000 East Street
Post-Bid
$176,800 est. value
Clearfield, UT 84015

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

River Bottom Improvement Project Prequalification
Post-Bid

Casa Loma Drive Culinary Waterline and Storm Drain
Results
$300,000 est. value
Centerville, UT 84014

Culinary Water Improvement Project on 300 West Street and 1600 North Street
Post-Bid
$250,920 est. value
Sunset, UT

Snowcreek Drive Water Line Replacement
Results
$315,000 est. value
Layton, UT 84040

Culinary Water Line Replacements
Post-Bid
$250,000 est. value
Bountiful, UT

Directional Boring and Conduit Installation - Contract
Term Contract
Results
Clearfield, UT 84016

East Chase Lane To Parrish Lane - Culinary Waterline and Storm Drain
Post-Bid
$450,000 est. value
Centerville, UT 84014

Last Updated 09/14/2020 03:45 PM
Project Title

8" Waterline Improvement Project on 1100 South

Physical Address View project details and contacts
City, State (County) Clearfield, UT 84015   (Davis County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $420,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction: Mobilization; obtaining all bonds and insurance, removal of existing asphalt and roadbase street surface materials; removal of curb & gutter, sidewalk, catch basins, waterways, and other flatwork; removal of miscellaneous landscaping; installation of curb & gutter, sidewalk, waterways, roadbase and asphalt surfacing; furnishing and installing new storm water catch basins and update of existing catch basin; furnishing and installing approximately 2,100 feet of 8-inch C-900 DR18 pvc culinary water pipe; reconnect of culinary water laterals, salvage and replacement of gate valves and fire hydrants, water line connections, landscaping, and all appurtenant work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents