Similar Projects
Wet Utilities Job Order Contract-Multiple Locations
Demolition
Design
$2,000 to $1,000,000 est. value
Washington, DC - Indian Head, Patuxent River, MD - Dahlgren, VA

Replace Potable Water Line
Results
Norfolk, VA

Troutville Meter System
Results
Troutville, VA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Wirt Street Waterline Improvements
Results
Less than $325,695 est. value
Leesburg, VA 20176

Route 156 Water Main Extension
Results
Prince George, VA 23875

Operation and Maintenance Services - Water and Sewer Systems
Results
VA

Wards Corner Service Area 150 Gravity Sewer and Water Main Replacement - Phase 6
Results
Less than $5,274,581 est. value
Norfolk, VA

Maintenance Services for Water Filtration System
Results
Portsmouth, VA

Installation of Water Meters
Results
Berryville, VA 22611

Meter Installation
Results
Chesterfield, VA 23832

Cornwall Street Waterline Improvements
Results
Leesburg, VA 20176

Staples Mill Road Pressure Reducing Valve (PRV)
Results
Henrico, VA

False Cape State Park Water System and Wash Woods Well Repairs
Results
Virginia Beach, VA 23456

Master Meter Vault Rehabilitation
Results
Less than $872,000 est. value
Norfolk, VA

Last Updated 03/03/2022 12:50 PM
Project Title

Advance Metering Infrastructure

Physical Address View project details and contacts
City, State (County) King George, VA   (King George County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified Offerors experienced in the supply and installation of all hardware and software that together comprise the proposed Advanced Metering Infrastructure (AMI) system. - Improved customer service - Access to real-time data that can notify of abnormal water usage. - Improved planning capabilities - Reduced water loss/non-revenue water. - Improved water conservation/water accountability - Replacement of water meters and meter boxes - Reduced current labor effort through read automation and systems interfacing. - Improved customer service through an interactive customer web portal with online customer bill pay. - Improved cash flow and reduced long-term operating costs.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents