Similar Projects
Rooted Investments Mixed Use Development
New Construction - 12,540 SF
Conception
$3,500,000 est. value
Visalia, CA 93291

Visser Apartments
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Visalia, CA 93277

Alejandras and Jimmy Johns Redbuild
New Construction
Design
$2,200,000 est. value
Visalia, CA 93291

Alejandras and Jimmy Johns Redbuild
New Construction
Design
$2,200,000 est. value
Visalia, CA 93291

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Post-Bid
Fresno, Sequoia National Park, CA

Springville New Public Library
New Construction, Infrastructure - 3,000 SF
Post-Bid
$2,300,000 CJ est. value
Springville, CA 93265

Apply gap graded RHMA
Infrastructure
Results
$3,030,000 est. value
CA

Elbow Creek Elementary Modular Site Work
Renovation, Infrastructure
Results
$450,000 est. value
Visalia, CA 93292

Tractor Supply Company
Renovation - 22,054 SF
Construction
$750,000 to $1,000,000 est. value
Tulare, CA 93274

West Putnam Elementary School Classroom
Addition, Demolition, Infrastructure
Construction
$11,049,000 CJ est. value
Porterville, CA 93257

The Darling Hotel Expansion Phase 2
Addition, Demolition, Renovation, Infrastructure - 12,000 SF
Pending Verification
$1,200,000 CJ est. value
Visalia, CA 93291

The Darling Hotel Expansion Phase 2
Addition, Demolition, Renovation, Infrastructure - 12,000 SF
Pending Verification
$1,200,000 CJ est. value
Visalia, CA 93291

Handel's Ice Cream Parlor
Build-Out - 1,908 SF
Design
$300,000 est. value
Visalia, CA 93277

Resurfacing of Perry Family Park Rubber Fall Area
Infrastructure
Post-Bid
Visalia, CA 93277

Cold Plane AC and Place HMA (Type A)
Infrastructure
Results
$3,020,000 est. value

Last Updated 06/27/2023 10:07 AM
Project Title

Orchard Walk West Phase 2

Physical Address View project details and contacts
City, State (County) Visalia, CA 93291   (Tulare County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Maintenance, Paving/Reconstruction, Retail, Sidewalks/Parking Lot, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $10,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a commercial development. As of June 26, 2023, site plans for this project have been approved. A building permit has not been applied for. A general contractor has been selected. A timeline for construction has not been announced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 39,905 SF - 34,400 SF, 192. 3,200 SF. 2,305 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents