Similar Projects
Police Department Bathroom Remodel
Renovation
Results
Webster Groves, MO 63119

Ballwin Police Station
New Construction - 33,534 SF
Post-Bid
Ballwin, MO 63011

Emerson Park Operational Control Center
New Construction - 16,113 SF
Design
$9,900,000 est. value
Saint Louis, MO

Police Department Remodel 2022
Renovation
Results
Crestwood, MO

Police Department Remodel - Flooring
Renovation, Alteration
Post-Bid
Crestwood, MO

Install Flooring For Fitness Center @ Police Department
Renovation, Alteration
Results

Construction Management Services for The Community Fire Protection District - CFPD House #1, #2, and #3 Renovations
Renovation
Post-Bid
$1,300,000 est. value
Overland, MO

Roof Replacement Interior Renovations - Community Fire Protection District
Renovation
Post-Bid
$200,000 est. value
Saint Louis, MO

Renovation to Metro West Fire House #3
Renovation
Results
$4,238,000 CJ est. value
Wildwood, MO 63038

Police Station - City of University City
New Construction, Renovation
Pending Verification
$5,000,000 CJ est. value
University City, MO 63130

10 South Brentwood Boulevard - Police Department Training Room
Demolition, Renovation, Infrastructure
Results
$98,213 CJ est. value
Clayton, MO 63105

Fire Department Radiant Heaters
Renovation
Post-Bid
$20,000 CJ est. value
Saint Louis, MO 63136

Administration Building Foyer Remodel
Build-out - 17,702 SF
Post-Bid
$300,000 CJ est. value
Chesterfield, MO 63017

Replacement of Gutters and Downspouts at Various City Buildings
Renovation
Post-Bid
$200,000 CJ est. value
Overland, MO 63114

Florissant Valley Fire Protection District - Partial Second Floor Renovation
Renovation
Post-Bid
$631,000 CJ est. value
Florissant, MO 63031

Last Updated 02/17/2023 01:48 PM
Project Title

Kitchen and Main Level Renovation (Design/Build)

Physical Address View project details and contacts
City, State (County) Ballwin, MO 63011   (Saint Louis County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

West County EMS and Fire Protection District (Fire District) is seeking bids for Kitchen and Main Floor Renovation (Design/Build). The Fire District reserves the right to terminate the contract for any violation, by the successful bidder, of any term or condition of the contract by giving thirty (30) days written notice stating the reasons therefore and giving the party time to remedy any deficiencies. All bid prices submitted must be guaranteed for ninety (90) days. One [1] signed original copy of the bid must be received in a sealed envelope plainly marked Kitchen and Main Floor Renovation (Design/Build). The Fire District reserves the right to accept and/or reject any and all bids. Furthermore, after review and consideration of the bids received, the Fire District will proceed with the best, qualified bid, which may not be the lowest bid submitted. The Fire District hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises (MBE) and distressed business enteprises (DBE) will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, creed, color, gender, gender expression, age, disability, sex, national origin or military status in consideration for an award. Bid results may be obtained by emailing such request to dfrazier@westcounty-fire.org. No phone calls please. The time it takes for final bid results to be made public depends on the complexity of the project district examination of bids and related information about the project. BID INQUIRIES Any questions or clarifications concerning this Bid must be submitted in writing via E- mail to: Dave Frazier Jr. Chief Financial Officer West County EMS & Fire Protection District dfrazier@westcounty-fire.org All questions/clarifications to this bid must be received no later than 1:00 p.m. on February 8, 2023. Any questions received after this deadline may not be answered.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents