Similar Projects
2025 Road Improvements-- CAP2510 - City of Royal Oak
Renovation, Infrastructure
Conception
Royal Oak, MI 48067

2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

City Hall Campus Parking Lot Replacement
Infrastructure
Design
Farmington Hills, MI 48336

Bloomfield Township 2022 Safety Path Program
Infrastructure
Bidding
$200,000 est. value
Bloomfield Township, MI

2022 Concrete Sidewalk Repair Program
Infrastructure
Bidding
$350,000 est. value
Birmingham, MI

Bike Racks for Sidewalks
Post-Bid
Wixom, MI

Woodland Elementary Sidewalk Replacement
Post-Bid
Auburn Hills, MI

City Hall Campus Parking Lot Replacement Project
Results
Less than $298,362 est. value
Farmington Hills, MI

1.20 MI of Hot Mix Asphalt Shared Use Path, Concrete Sidewalk and Ramps, Pedestrian Signals and Retaining Walls
Results
MI

Construction of a Roundabout including, Concrete Curb, Gutter and Ramps, Guardrail on Taft Road
Infrastructure
Bidding
$3,922,000 est. value
Novi, MI 48374

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

Main Entrance Improvement Project
Results
Berkley, MI 48072

2022 Retaining Wall Repair Program
Infrastructure
Bidding
$600,000 est. value
Bloomfield Township, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Exterior
Post-Bid

Gallagher Road Trail
Results
Rochester, MI 48306

Last Updated 06/16/2022 02:47 AM
Project Title

3 SAD Projects (Tappon Court, Mystic Hills, Rome Park)

Physical Address View project details and contacts
City, State (County) Beverly Hills, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT No. 10068, Tappon Court. A Contract for 4" Hma Surface Over Pulverized Base With Sodded Shoulders and Minor Drainage Improvements on 978 Lineal Feet or 0.20 Miles of Tappon Court, Located South of Dixie Highway and East of White Lake Road in Independence Township, Oakland County, Michigan. PROJECT No. 12003, Mystic Hills. A Contract for 4" Hma Surface Over Pulverized Base With Areas of Curb and Gutter Removal/replacement, Sodded Shoulders and Minor Drainage Improvements on 6,519 Lineal Feet or 1.20 Miles of Foxfire Drive, Huntcliff Court, Mystic Hills Drive and Rolling Green Court, Located South of General Motors Road and East of Hickory Ridge Road in Milford Township, Oakland County, Michigan. PROJECT No. 24238, Rome Park A Contract for 5" Hma Surface Over Aggregate Base With Sodded Shoulders and Minor Drainage Improvements on 2,201 Lineal Feet or 0.42 Miles of Arline Drive (Platted as Josephine Drive) and Edkins Street (Platted as Eleanor Drive), Located South of Pontiac Trail and West of Orchard Lake Road in West Bloomfield Township, Oakland County, Michigan.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents