Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

Rochester High School Storm Drainage Projects
Post-Bid
Rochester Hills, MI 48309

Mercer Beach Improvements Phase 1
Infrastructure
Post-Bid
Walled Lake, MI

Riverside Bank Stabilization 2020
Results
Auburn Hills, MI

Lee Begole Drive Headwall Reconstruction / Bishop Creek Streambank Restoration
Results
Less than $940,384 est. value
Novi, MI 48375

Lahser Road Drainage Repairs
Infrastructure
Post-Bid
Beverly Hills, MI 48025

11 Mile Road over Novi-Lyon Drain Culvert Replacement
Results
Beverly Hills, MI

Future Dam Removal Project
Renovation
Post-Bid
Davisburg, MI

Corrugated Metal Pipe, Bands, And Bolts
Results
Beverly Hills, MI

Maloney Avenue over Clear Lake/Long Lake Canal Box Culvert Furnish and Deliver
Infrastructure
Post-Bid
Beverly Hills, MI

Union Lake Road Over Hayes Drain
Results
Less than $970,000 est. value
Beverly Hills, MI

Corrugated Metal Pipe, Bands, and Bolts
Infrastructure
Post-Bid
Beverly Hills, MI

Beach Erosion Control at Camp Dearborn
Results
Milford, MI 48380

Milford Road over Buckhorn Creek
Results
Beverly Hills, MI

Drainage Structure Repairs and Concrete Curb And Gutter
Results
MI

Last Updated 03/23/2022 03:04 AM
Project Title

Davisburg Mill Pond Dam Removal and River Restoration

Physical Address View project details and contacts
City, State (County) Davisburg, MI 48350   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Includes all, but not limited to materials, labor, permit, overhead and profit for the Removal of existing dam structure and installation of proposed open-bottom culvert, dewatering of impoundment and subsequent reconstruction and restoration of the river channel and former impoundment. This base bid does not include the removal and reconstruction of the roadway.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents