Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Water Main Replacement
Design
Elmwood Park, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Berwyn Depot District Utility Improvements
Results
Less than $11,765,090 est. value
Berwyn, IL

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Chicago Department of Transportation Job Order Contract for Flatwork - Site Work
Post-Bid
Chicago, IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Emergency Watermain and Sewer Services
Post-Bid
Park Ridge, IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Large Riding Floor Sweeper/Scrubber
Post-Bid
Arlington Heights, IL

Last Updated 09/06/2022 12:37 AM
Project Title

2022 Road Repair Project

Physical Address View project details and contacts
City, State (County) Indian Head Park, IL 60525   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $996,318 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 2, 2022, the project has been awarded to Schroeder Asphalt Services, Inc. for $996,317.81 Pavement - Marking, Aggregate, Sidewalks/Curbs/Gutters, Street/Road Asphalt Resurfacing and Milling, Traffic Control, Curbs, Pavement Removal, Paving (Asphalt or Concrete) In general, the project includes resurfacing existing asphalt roadways. Work includes, but is not limited to 2 inch pavement surface removal, 2"-3.5" inch pavement surface removal, intermittent curb and gutter removal and replacement, full-depth pavement patching, utility structure adjustments, aggregate shoulders, grading and shaping ditches, resurfacing with hot-mix asphalt level binder and surface courses, landscape restoration, pavement markings, traffic control and protection, and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents