Lundbar Hills Backup Generator And Fire Pump Booster Replacement
Renovation, Infrastructure
Conception
Less than $250,000 est. value
Eureka, CA 95503

Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Owner - Furnished Gate Crossing Mechanism Installation
Renovation
Sub-Bidding
$242,000 CJ est. value
Sacramento, CA 95814

Mechanical Upgrade Project at New District Office
Renovation
Sub-Bidding
$250,000 CJ est. value
San Jose, CA 95131

Sources Sought for Mechanical Repairs in CA RO
Term Contract
Post-Bid
Richmond, CA

Boiler Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

EMS Upgrades at the Main Library
Alteration
Results
$347,500 est. value
Burlingame, CA 94010

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Gate Opener Replacement Project for Police District Substations 1 and 2
Alteration
Results
$32,000 est. value
Visalia, CA 93291

Job Order Contract - Mechanical
Alteration
Post-Bid
Clovis, CA

SJC On-Call Mechanical Contract 21-22
Alteration
Results
$1,000,000 est. value
San Jose, CA 95110

44--Option - Boiler Inspection
Term Contract
Post-Bid
Petaluma, CA 94952

Z--Mechanical Repairs
Term Contract
Results
Richmond, CA 94801

Boiler Maintenance Services
Term Contract
Post-Bid
CA

Last Updated 09/30/2022 02:33 PM
Project Title

Old City Hall Bldg. Receiver Room AC Replacement and Regal Theater AC Replacement

Physical Address View project details and contacts
City, State (County) San Bernardino, CA 92418   (San Bernardino County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All questions should be submitted to the Project Manager Mirela Grigorescu at Grigorescu_mi@sbcity.org before on or before Monday October 17, 2022 at the end of closing business day at 5:30 pm. PREVAILING WAGE: Notice is hereby given that in accordance with the provisions of California Labor Code, Division 2, Part 7, Chapter 1, Articles 1 and 2, the Contractor ifs required to pay not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work. In that regard, the Director of the Department of Industrial Relations of the State of California is required to and has determined such general prevailing rates of per diem wages. Copies of such prevailing rates of per diem wages are on file in the office of the City Engineer, 201 North "D" Street, San Bernardino, California, and are available to any interested party on request. The City also shall cause a copy of such determinations to be posted at the job site. Pursuant to Labor Code 1775, the Contractor shall forfeit, as penalty to the City, not more than fifty dollars ($50.00) for each laborer, workman, or mechanic employed for each calendar day or portion thereof, if such laborer, workman, or mechanic is paid less than the general prevailing rate of wages hereinbefore stipulated for any work done under the attached contract, by him or by any subcontractor under him, in violation of the provisions of said Labor Code. In accordance with the provisions of 1777.5 of the Labor Code, as amended, and in accordance with the regulations of the California Apprenticeship Council, properly indentured apprentices may be employed in the prosecution of the work. Attention is directed to the provisions in 1777.5 and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under him. SUBCONTRACTED WORK: The name, Contractor License Number and location of business of any subcontractor who will perform work exceeding 1/2 of 1% of the prime contractor's total bid or ten thousand dollars ($10,000), whichever is greater, must be submitted with the bid. Any other information regarding the foregoing subcontractors that is required by City to be submitted may be submitted with the bid, or may be submitted to City up to 24 hours after the deadline established herein for receipt of bids. The additional information must be submitted by the bidder to the same address and in the same form applicable to the initial submission of bid. INELIGIBLE SUBCONTRACTORS: The successful bidder shall be prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Section 1999.1 or 1777.7 of the Labor Code. YOU MUST SUBMIT with your proposal cash, cashier's check, certified check, or bidder's bond, payable to the City of San Bernardino in an amount equal to at least ten percent (10%) of the bid as a guarantee that the bidder will enter into the contract if the same is awarded to him, and in the event of failure to enter into such contract said cash, cashier's check, certified check, or bond shall become the property of the City f San Bernardino. If the City of San Bernardino awards the contract to the next lowest bidder, the amount of the lowest bidder's security shall be applied to the difference between the low bid and second lowest bid, and the surplus, if any, shall be returned to the lowest bidder. The Contractor shall be required to post a bond in the amount of 100% of the contract price and a labor and material bond equal to 50% of the contract price. No proposal will be considered from a Contractor who is not licensed as a Class "A" or "B" and "C-20" License" contractor, at time of bid, or to whom a proposal form has not been issued by the City of San Bernardino. The work is to be done in accordance with the plans and specifications on file in the Office of the City Engineer. Electronic Copies of the plans and specifications shall be available to be downloaded (copied) from the CITY's website. The Contractor may, upon the Contractor's request and the Contractor's sole cost and expense, substitute authorized securities in lieu of moneys withheld (performance retention). The successful bidder will be required to enter into a contract satisfactory to the City of San Bernardino. The City of San Bernardino reserves the right to reject any and all bids, or to waive any irregularities in the bids liquidated damages in the amount of One Thousand Dollars ($1,000.00) per working day.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents