Similar Projects
New Middle School Construction
New Construction
Conception
$52,111,279 est. value
Greer, SC 29651

Laurens Road Swamp Rabbit Trail (SRT) - City of Greenville
Infrastructure
Conception
$1,500,000 est. value
Greenville, SC 29613

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Design
$600,000 CJ est. value
Greer, SC 29651

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

Greenville Technical College - Parking Lot R Construction
Infrastructure
Bidding
$3,500,000 CJ est. value
Greenville, SC 29607

Intersection Safety Improvements - US 15/SC 61
Infrastructure
Bidding
$2,000,000 CJ est. value
Walterboro, SC 29488

PRISMA Health Swamp Rabbit Trail Signal Installation
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Greenville, SC 29601

PRISMA Health Swamp Rabbit Trail Signal Installation
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Greenville, SC 29601

Stc For Asbestos/Lead Paint/Mold Collect
Post-Bid

Schindler Elevators Maintenance And Inspections
Post-Bid
Fort Mill, SC

Site Grading at 113 Leesburg Peak
Results
Greer, SC 29651

Burger King Force Main Jack and Bore
Infrastructure
Results
Greenville, SC

BridgeWay Station Mixed-Use / Mauldin
New Construction, Infrastructure - 300,000 SF
Construction
$100,000,000 CJ est. value
Simpsonville, SC 29681

Ford Street Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Greer, SC 29650

Water Tower Crossing / Hampton Ave
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Greenville, SC 29601

Last Updated 08/16/2022 03:06 PM
Project Title

Retaining Wall Site Clearing at Powdersville High School

Physical Address View project details and contacts
City, State (County) Greenville, SC 29611   (Greenville County)
Category(s) Education, Heavy and Highway, Single Trades
Sub-Category(s) Middle/Senior High School, Service/Term Contracts, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 8/16/2022, this project has been awarded but the award amount was not confirmed. Anderson School District One is seeking a qualified contractor to clean growth from a retaining wall at Powdersville High School. Project Location: Powdersville High School 145 Hood Rd Greenville, SC 29611 Construction Cost Range: $10,000-$100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Erosion and Sedimentation Controls, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Retaining Walls, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents