Rehabilitation Taxiway B - City of La Crosse
Renovation, Infrastructure
Conception
$2,650,000 est. value
La Crosse, WI 54603

Reconstruct South Terminal Parking Lot - City of La Crosse
Infrastructure
Conception
$1,200,000 CJ est. value
La Crosse, WI 54603

2022 Sewer Rehabilitation
Infrastructure
Design
$620,000 CJ est. value
Campbell, WI 54603

2022 Sewer Rehabilitation
Infrastructure
Design
$620,000 CJ est. value
Campbell, WI 54603

LED Upgrade
Infrastructure, Alteration
Post-Bid
$39,000 est. value
La Crosse, WI

2022 Pavement
Infrastructure
Post-Bid
Onalaska, WI

LaCrosse - Westby, .17 Mi. E. Mathison Lane to High Echo Lane
Infrastructure
Results
La Crosse, Westby, WI

South 33 -IH90 (Wolter Road to CTH B) CTH M
Infrastructure
Results
West Salem, WI 54669

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Performance Elite Gymnastics Expansion
Addition, New Construction, Infrastructure - 6,550 SF
Pending Verification
$1,500,000 CJ est. value
La Crosse, WI 54603

Performance Elite Gymnastics Expansion
Addition, New Construction, Infrastructure - 6,550 SF
Pending Verification
$1,500,000 CJ est. value
La Crosse, WI 54603

Bliss Road Slope Repair and Stabilization - 649 - City of La Crosse
Infrastructure
Conception
$800,000 CJ est. value
La Crosse, WI 54601

River Point District
New Construction, Infrastructure
Design
$22,000,000 CJ est. value
La Crosse, WI 54601

2022 Miscellaneous Curb and Gutter
Infrastructure
Post-Bid
La Crosse, WI

Last Updated 06/06/2023 02:36 AM
Project Title

Driveway Replacement

Physical Address View project details and contacts
City, State (County) Onalaska, WI 54650   (La Crosse County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $325,100 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of: removal and replacement of the concrete pavement for the driveway to the facility, sidewalk improvements, traffic control, and erosion control. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin, Administration Building, 7th 39 Floor, 101 East Wilson Street, Madison, Wisconsin 53703; or Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted Contract offer and construction phase records will be processed electronically on the WisBuild DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building 18 projects no longer apply. These changes take effect for projects advertised for bid after September 19, 2017. This change does not affect the Federal Davis Bacon Act requirements. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000 This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each 25 applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will 27 publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents