Similar Projects
Water Distribution System Hydrant Replacements
Bidding
Less than $20,000 est. value
Saugus, MA

Various Water Distribution System Valve Replacements
Bidding
Less than $25,000 est. value
Saugus, MA

Purchase of Water and Sewer Supplies for Public Works Department
Post-Bid
Less than $90,000 est. value
Salem, MA

Water Replacement Project
Post-Bid
Less than $1,000,000 est. value
Salem, MA

Ductile Iron Pipe and Fittings
Results
Danvers, MA

Gates Field Irrigation System Rehabilitation
Results
Less than $47,500 est. value
Danvers, MA

Contract 3 - Water Main Improvements
Bidding
Less than $1,800,000 est. value
Andover, MA

Install Commercial Water Meters in Brooksby Village
Post-Bid
Less than $95,000 est. value
Peabody, MA 01960

Purchase of Fire Hydrants
Results
Methuen, MA

Water Main Improvements (Atlantic Avenue and Jessie Street)
Bidding
$1,100,000 est. value
Swampscott, MA 01907

Highland Avenue Water Lining
Post-Bid
Less than $600,000 est. value
Salem, MA

Water Meters and Related Hardware
Results
Gloucester, MA 01930

2021 Water System Improvements
Post-Bid
$2,200,000 est. value
Marblehead, MA

FY20 thru FY22 On-Call Utility Repair Emergency Services Contract
Term Contract
Results
Manchester-By-The-Se, MA

Leak Detection-Correlation Services
Post-Bid
Methuen, MA

Last Updated 02/07/2020 12:23 PM
Project Title

Hobart Street and Centre Street Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Danvers, MA   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work will involve replacement of approximately 6,000 linear feet of existing water mains with new 12” and 8” ductile iron water mains within the paved road surface and shoulder of roadway, including replacing water main across Route 1 Centre Street exit and installation of new copper water services to each property. The work will involve installation of temporary water mains above the ground during construction, excavation to remove existing water mains and install new water mains and services. Following installation of the new water mains and services, the excavated areas will be backfilled and paved within the existing road surface or loamed and seeded in the shoulder areas. Once the work is complete, the temporary water mains will be removed. The work also includes temporary and permanent trench paving and curb-to-curb milling and overlay paving.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents