Similar Projects
Stormwater Repairs Phase III Construction
Alteration
Design
$5,200,000 est. value
WA

Jan Road Levee Setback Construction
Alteration
Design
$6,000,000 est. value
WA

Little Bear Creek Advanced Mitigation Site
Infrastructure
Bidding
$2,031,167 est. value
Woodinville, WA

Raincity Partnerships
Infrastructure
Bidding
Seattle, WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Eastrail North Segment Tie Removal and Interim Trail Phase 2
Infrastructure
Post-Bid
$1,280,212 est. value
Kirkland, Woodinville, WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Fall City Floodplain Restoration Planting
Alteration
Design
$1,000,000 est. value
WA

Grouse Ridge Road Rmap Upgrade Phase Two
Infrastructure
Bidding
North Bend, WA 98045

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

Geosynthetic and Erosion Control
Infrastructure
Post-Bid
WA

2442 WLSP Sinkhole Lake Restoration
Infrastructure
Results
$276,650 est. value
Bellevue, WA 98008

Environmental Consulting Services for 2021 Stormwater Code Amendments
Renovation, Alteration
Post-Bid
$75,000 est. value
Sammamish, WA 98075

Last Updated 12/15/2021 11:57 PM
Project Title

Lincoln Landing Shoreline and Storm Water Enhancement

Physical Address View project details and contacts
City, State (County) Mercer Island, WA 98040   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $414,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes, but is not limited to: site preparation, demolition existing site features and infrastructure including, existing step bulkhead, buried utilities, site hardscape and paving; excavation, handling, transport, and offsite disposal of soil; site earthworks including, shoreline excavation and beach material installation, water course excavation and restoration, installation of grading; stormwater management within and adjacent to the development; temporary erosion and sediment control (TESC); utility protection; utility installation; excavation backfilling, paving, signing, landscaping, and site restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents