Similar Projects
Reported | 05/08/2021 12:00 AM |
Project Title | Woodland Hills Waterline Replacement - Phase 2A |
Physical Address | View project details and contacts |
City, State (County) | Woodland Hills, UT (Utah County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project includes installation of new 8-inch PVC C-900 to replace the existing 6-inch waterline. The project includes two schedules, either of both schedules may be awarded. Schedule A includes installing 825 linear feet of new 8-inch PVC-C-900 waterline on Maple Drive along with new service laterals, import backfill, fire hydrants, and connecting the existing system. Schedule B includes installing 715 linear feet of new 8-inch PVC-C-900 waterline on Settlement Drive along with new service laterals, import backfill fire hydrants, and connecting the existing system. Each schedule also includes milling and compacting the existing asphalt in place and installing 3-inches of new asphalt for the full road width. Project is in the city street rights-of-way of Woodland Hills, Utah. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |