Similar Projects
Utah Valley University Campus Infrastructure Domestic Water Phase II
Bidding
$470,000 est. value
Orem, UT 84058

100 West Sewer Improvements
Bidding
Pleasant Grove, UT

Water Line Pipe and Fittings
Post-Bid
Provo, UT

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

800 South Waterline Replacement Project
Results
Less than $305,140 est. value
Alpine, UT 84004

Pressurized Irrigation Metering Project
Post-Bid
Lehi, UT 84043

State Street Water Line 470 West - 200 West
Results
Less than $500,000 est. value
American Fork, UT

West Access Road and Waterline Improvements
Post-Bid
Eagle Mountain, UT 84005

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Pole Canyon Water Line and Force Main Sewer
Post-Bid
Eagle Mountain, UT

Spanish Fork Jr High Transportation Corridor Phase 1
Results
Less than $1,600,000 est. value
Spanish Fork, UT 84660

Pre-construction design assistance and Construction Services for Waterline Replacement
Post-Bid
Woodland Hills, UT 84653

PRV Project
Results
Less than $441,000 est. value
Pleasant Grove, UT 84062

2020 2000 South PRV Project
Post-Bid
Orem, UT 84058

Reported 05/08/2021 12:00 AM
Project Title

Woodland Hills Waterline Replacement - Phase 2A

Physical Address View project details and contacts
City, State (County) Woodland Hills, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes installation of new 8-inch PVC C-900 to replace the existing 6-inch waterline. The project includes two schedules, either of both schedules may be awarded. Schedule A includes installing 825 linear feet of new 8-inch PVC-C-900 waterline on Maple Drive along with new service laterals, import backfill, fire hydrants, and connecting the existing system. Schedule B includes installing 715 linear feet of new 8-inch PVC-C-900 waterline on Settlement Drive along with new service laterals, import backfill fire hydrants, and connecting the existing system. Each schedule also includes milling and compacting the existing asphalt in place and installing 3-inches of new asphalt for the full road width. Project is in the city street rights-of-way of Woodland Hills, Utah.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents