Last Updated 05/03/2019 05:53 AM
Project Title

Emergency Highway ITS and Traffic Maintenance

Physical Address View project details and contacts
City, State (County) State-Wide: DE
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1,080.00 Hour Trainee 1.00 Ls Perform And Pay Bond, Open-End Sig Cont 50.00 Eady Arrow Panels Type c 70.00 Eady Furnish And Maint Portable Chg Mess Sign 25.00 Eady Furn And Maint Portable Light Assembly 1,500.00 Eady Plastic Drums 200.00 Hour Traffic Officers 50.00 Eady Furn And Maint Truck Mount Att, Type Ii 60.00 Hour Furn & Main Strgt Boom, Up To 80` (Hour) 100.00 Eady Furn & Main Strgt Boom, Up To 80`(Day) 400.00 Eady Temporary Warning Signs And Plaques 125.00 Hour Flagger, New Castle County, State 50.00 Hour Flagger, Kent County, State 85.00 Hour Flagger, Sussex County, State 50.00 Hour Flagger, New Castle County, State, Ot 17.00 Hour Flagger, Kent County, State, Overtime 35.00 Hour Flagger, Sussex County, State, Overtime 2,400.00 Lfdy Temporary Barricades, Type Iii 250.00 Lf Temporary Sidewalk, Type 2 (Boardwalk) 500.00 Lf Relocate Temporary Sidewalk - Type 2 200.00 Sy Temporary Pedestrian Pathway 50.00 Sf Install Overhead Sign 40.00 Sf Install Of Sign On Span Wire Or Mast Arm 30.00 Each Removal Of Sign On Span Wire Or Mast Arm 250.00 Each Cond Junct Well,Type 1, 20"x20", Precast 50.00 Each Cond Junct Well,Type 4, 20"x42 1/2" Pre 14.00 Each Cond Junct Well, Type 5, 24"x16" Precast 10.00 Each Cond Junct Well, Type 7, 36"x60" Precast 40.00 Each Adj Or Repair Exist Cond Junct Well 20.00 Each Relocation Of Existing Junction Well 20.00 Each Removal Of Existing Junction Well 7.00 Each Furn & Install Frame/Lid Junct, Type 1 4.00 Each Furn & Install Frame/Lid Junct, Type 4 2.00 Each Furn & Install Frame/Lid Junct, Type 5 4.00 Each Furn & Install Pre Poly Cov Junct,Type 7 200.00 Lf Removal Of Conduit From Wood Pole 375.00 Lf Furn And Inst 4" Sch 80 Pvc Conduit (Oc) 250.00 Lf Furn & Inst 3" Sch 80 Pvc Conduit (Oc) 100.00 Lf Furn & Inst 2-1/2" Sch 80 Pvc Condu (Oc) 75.00 Lf Furn & Inst 2" Sch 80 Pvc Conduit (Oc) 50.00 Lf Furn & Inst 1" Sch 80 Pvc Conduit (Oc) 50.00 Lf Furn & Inst 1" Sch 80pvc Conduit (Trnch) 125.00 Lf Furn & Inst 2" Sch 80pvc Conduit (Trnch) 750.00 Lf Furn&Inst 2-1/2" Sch80pvc Conduit (Trnc) 450.00 Lf Furn & Inst 3" Sch 80pvc Conduit (Trnch) 375.00 Lf Furn & Inst 4" Sch 80pvc Conduit (Trnch) 75.00 Lf Furn & Inst 1" Sch 80pvc Conduit (Onstc) 100.00 Lf Furn & Inst 2" Sch 80pvc Conduit (Onstc) 120.00 Lf Furn&Inst 2-1/2" Sch80pvc Conduit(Onstc) 250.00 Lf Furn & Inst 3" Sch 80pvc Conduit (Onstc) 300.00 Lf Furn & Inst 4" Sch 80pvc Conduit (Onstc) 50.00 Lf Furn & Inst 1"Galv Steel Conduit (Trnch) 125.00 Lf Furn & Inst 2"Galv Steel Conduit (Trnch) 750.00 Lf Furn&Inst 2-1/2"Galv Stl Conduit (Trnch) 450.00 Lf Furn & Inst 3"Galv Steel Conduit (Trnch) 375.00 Lf Furn & Inst 4"Galv Steel Conduit (Trnch) 25.00 Lf Funr & Inst 1"Galv Steel Conduit (Bore) 65.00 Lf Furn & Inst 2"Galv Steel Conduit (Bore) 90.00 Lf Furn&Inst 2-1/2"Galv Steel Conduit(Bore) 125.00 Lf Furn & Inst 3"Galv Steel Conduit (Bore) 190.00 Lf Furn & Inst 4"Galv Steel Conduit (Bore) 50.00 Lf Furn & Inst 1"Galv Steel Conduit (Oc) 75.00 Lf Furn & Inst 2"Galv Steel Conduit (Oc) 100.00 Lf Furn&Inst 2-1/2"Galv Steel Conduit (Oc) 250.00 Lf Furn & Inst 3"Galv Steel Conduit (Oc) 375.00 Lf Furn & Inst 4"Galv Steel Conduit (Oc) 75.00 Lf Furn & Inst 1"Galv Steel Conduit (Onstc) 100.00 Lf Furn & Inst 2"Galv Steel Conduit (Onstc) 125.00 Lf Furn&Inst 2-1/2"Galv Stel Conduit(Onstc) 250.00 Lf Furn & Inst 3"Galv Steel Conduit (Onstc) 300.00 Lf Furn & Inst 4"Galv Steel Conduit (Onstc) 250.00 Lf Furn & Inst 2"Hdpe 13.5sdr Conduit(Bore) 125.00 Lf Furn&Inst 2-1/2"Hdpe 13.5sdr Cond(Bore) 375.00 Lf Furn & Inst 3"Hdpe 13.5sdr Conduit(Bore) 750.00 Lf Furn & Inst 4"Hdpe 13.5sdr Conduit(Bore) 50.00 Lf Furn&Inst 1-1/2" Sch80 Pvc Cond (Op Cut) 75.00 Lf Furn&Inst 1-1/2" Sch80 Pvc Cond (Trench) 90.00 Lf Funr&Inst 1-1/2" Sch80 Cond (On Struct) 50.00 Lf Furn&Inst 1-1/2" Galv Steel Cond(Op Cut) 75.00 Lf Furn&Inst 1-1/2" Galv Steel Cond(Trench) 50.00 Lf Furn&Inst 1-1/2" Galv Steel Cond (Bore) 75.00 Lf Furn&Inst 1-1/2" Galv Steel Cond(On Str) 25.00 Lf Furn&Inst 2nd And Sub Add 1" Sch80 Pvc 40.00 Lf Furn&Instal 2nd And Sub Add 1-1/2" Sch80 50.00 Lf Furn&Inst 2nd And Sub Add 2" Sch80 Pvc 75.00 Lf Furn&Inst 2nd And Sub Add 2-1/2" Sch80 p 125.00 Lf Funr&Inst 2nd And Sub Add 3" Sch80 Pvc 250.00 Lf Furn&Inst 2nd And Sub Add 4" Sch80 Pvc 125.00 Lf Furn&Inst 2nd And Sub Add 2"Hdpe 13.5sdr 125.00 Lf Funr&Inst 2nd And Sub Add 2.5" Hdpe 13.5 125.00 Lf Furn&Inst 2nd And Sub Add 3"Hdpe 13.5sdr 250.00 Lf Funr&Inst 2nd And Sub Add 4"Hdpe 13.5sdr 25.00 Lf Furn&Inst 2nd And Sub Add 1" Galv Steel 25.00 Lf Furn&Inst 2nd And Sub Add 1.5" Galv Stee 50.00 Lf Furn&Inst 2nd And Sub Add 2" Galv Steel 75.00 Lf Furn&Inst 2nd And Sub Add 2.5" Galv Stee 125.00 Lf Furn&Instal 2nd And Sub Add 3" Galv Stee 250.00 Lf Furn&Instal 2nd And Sub Add 4" Galv Stee 25.00 Lf Furn&Instal 2nd And Sub Add 1"Steel Dir 50.00 Lf Furn&Instal 2nd And Sub Add1-1/2"Stl Dir 65.00 Lf Furn&Instal 2nd And Sub Add 2"Steel Dir 75.00 Lf Furn&Instal 2nd And Sub Add 2.5"Stl Dir 125.00 Lf Furn&Instal 2nd And Sub Add 3"Steel Dir 200.00 Lf Furn&Instal 2nd And Sub Add 4"Steel Dir 125.00 Lf Furn & Inst 1-Con#4/0 Awg Str Cop, Use-2 185.00 Lf Furn & Inst 1-Con#3/0 Awg Str Cop, Use-2 250.00 Lf Furn & Inst i-Con#2/0 Awg Str Cop, Use-2 625.00 Lf Furn & Inst 1-Con#2 Awg Str Cop, Use-2 425.00 Lf Furn & Inst 1-Con#4 Awg Str Cop, Use 2 1,425.00 Lf Furn & Inst 1-Con #6 Str Cop, Use-2 7,125.00 Lf Furn & Inst 1-Con #8 Awg Str Cop, Use-2 1,250.00 Lf Furn & Inst 1-Con #10 Awg Str Cop, Use-2 1,625.00 Lf Furn & Inst 4-Con #18 Awg Shl Opt Cable 250.00 Lf Furish & Install 1-Con #14 Awg Str Cop 5,000.00 Lf Furn & Inst 1-Con #14 Awg Shl Cable 125.00 Lf Furn & Inst #8/2 Wire Uf w/Ground 500.00 Lf Furn & Inst #6 Triplex Alum Serv Cable 175.00 Lf Furn & Inst 14/4 Traffic Control Cable 2,500.00 Lf Furn & Inst 14/9 Traffic Control Cable 1,675.00 Lf Furn & Inst 14/16 Traffic Control Cable 2,500.00 Lf Rem Of Cable From Con Or Traf/Light Pole 200.00 Each Splicing Of Electrical Cable, Undergrond 65.00 Each Splicing Of Electrical Cable, Abovegrnd 250.00 Each Triplex Splice 750.00 Lf Furn n Instal #8 Thhn Standard Copper 2,500.00 Lf Furn n Instal #6 Awg Solid Copper Wire 375.00 Lf Furn n Instal #1/0 Awg Stranded Copper 1,300.00 Lf Furn & Inst 14/5 Traffic Control Cable 100.00 Each Bond & Grout Existing Junction Well 10.00 Each Furnish & Install Ground Rod 20.00 Each Pole Base, Type 3 20.00 Each Pole Base, Type 3a 20.00 Each Pole Base, Type 3b 20.00 Each Pole Base, Type 3c 60.00 Each Pole Base, Type 4a 35.00 Each Pole Base, Type 6 70.00 Cf Pole Base Extension 6.00 Each Sheeting For Pole Base 10.00 Cy Part Removal Of Con Pole Base + Cabinet 100.00 Each Light Standard Attachments 50.00 Each Removal Of Street Lighting System 15.00 Each Pole Base, Type 4b 4.00 Each Pole Base, Type 1 6.00 Each Pole Base, Type 2 6.00 Each Pole Base, Type 2a 6.00 Each Pole Base, Type 2b 1.00 Each Cabinet Base Type f 4.00 Each Cabinet Base Type m 10.00 Each Cabinet Base Type p 2.00 Each Cabinet Base Type r 10.00 Lf Furnish And Install Addit Discon Switch 3.00 Each Cabinet Base, Type k (Hib) 25.00 Each Inst Stl Pole (= Or > Than 17` & < 40`) 4.00 Each Install Steel Pole (Equal To Or > 40`) 2.00 Each Remove Steel Pole (Equal To Or > 40`) 25.00 Each Remove Pedestal Pole 10.00 Each Stl Mast Arm Pol w Sing Mast Arm < 70` 40.00 Each Furnish And Install Pedestal Pole 16.00 Each Remove Steel Pole (Equal To Or >15`<40`) 17.00 Each Install Steel Mast Arm Pole w/Sing Twin 50.00 Each Furnish 10` Pedestal Pole 20.00 Each Furnish 14` Pedestal Pole 30.00 Each Furnish Pedestal Pole Transformer Base 7.00 Each Furn & Inst 8" Led Sign Hd Sec, Rig Moun 145.00 Each Furn & Inst 12" Led Sgn Hd Sec, Rgd Mnt 10.00 Each Furn & Inst 8" Led Sgl Hd Sec, Span Moun 220.00 Each Furn & Inst 12" Led Sgn Hd Sec, Span Mnt 4.00 Each Furn & Inst 8" Led Tfc Sgn Hd Indic Mod 35.00 Each Furn & Inst 12" Led Tfc Sgn Hd Indic Mod 100.00 Each Furnish & Install Signal Head Backplate 70.00 Each Furnish & Install 16" Led Cntdwn Ped Sgl 7.00 Each Furn & Inst 16" Led Ped Sgl Hd Indic Mod 70.00 Each Furnish & Install Ped Pshbtn With Sign 35.00 Each Realign Or Slide Existing Signal Head 50.00 Each Removal Of Signal Or Ped Head From Pole 100.00 Each Install And Remove Trfc Sig Hed Indicati 100.00 Each Install And Remove Of Trfc Ped Sig Head 15.00 Each Furnish 8" Led Signal Head Section 180.00 Each Furnish 12" Led Signal Head Section 90.00 Each Furnish 8" Led Traffic Signal Head Indic 240.00 Each Furnish 12" Led Traffic Signal Head Indi 80.00 Each Furnish 16" Led Countdown Ped Sig Head 80.00 Each Furnish 16" Led Cntdwn Ped Sig Head Indi 120.00 Each Furnish Pedestrain Pushbutton w/ Sign 80.00 Each Furnish Signal Head Backplate 1,000.00 Lf Furnish & Install Span Wires, 7/16" 250.00 Lf Furn & Inst Span Wires, 1/4" 4.00 Each Furn & Inst Dead End Mess Wire Attach 17.00 Each Adjustment Of Span Or Messenger Wire 4.00 Each Transfer Of Existing Span Or Mess Attach 300.00 Lf Removal Of Mess Wire, Cable & Hardware 50.00 Each Removal Of Span Wire Attachment 1,000.00 Lf Removal Of Cable From Messenger Wire 120.00 Each Remove Of Sig Head Or Opticom From Spwir 10.00 Each Cutting Of Wood Pole 10.00 Each Removal Of Wood Pole 4.00 Each Furn & Inst Wood Pol, Clas Ii (Hvy) 30` 6.00 Each Furn & Inst Wood Pol, Clas Ii (Hvy) 40` 8.00 Each Furn & Inst Wood Pol, Clas Ii (Hvy) 50` 4.00 Each Furn & Inst Wood Pole, Class Iii 30` 6.00 Each Furn & Inst Wood Pole, Class Iii 40` 8.00 Each Furn & Inst Wood Pole, Class Iii 50` 35.00 Each Furnish & Install Down Guy And Anchor 8.00 Each Removal Of Down Guy And Anchor 2.00 Each Removal Of Overhead Guy 12.00 Each Furn & Inst Wthrhd, Up To 3", On Stl Pol 10.00 Each Rem Of Elec Service On Wood Or Metal Pol 10.00 Each Install Or Remove Of Ped Button On Wood 100.00 Each Furn & Inst Ele Utility Serv Equip (100a 100.00 Each Furn & Inst Ele Utility Serv Equip (200a 40.00 Each Furn & Inst Opticom Emer Pre Detector 20.00 Each Furnish And Install Microwave Detector 20.00 Each Furnish And Install Video Detector 5.00 Each Furnish And Install Thermal Detector 10.00 Each Furnish Video Detector 5.00 Each Furnish Thermal Detector 10.00 Each Furnish Microwave Detector 2,250.00 Lf Furn & Inst Loop Wire 1-Con #14 Awg 1/4" 250.00 Lf Furn & Inst 1-1/2" Gal Rig Met Con Det 4.00 Each Inst Or Rem Of Pole Or Post Mount Cabnt 4.00 Each Inst Or Rem Base Or Pad Mount Cabinet 20.00 Each Light Ctrl & Dist Encl (120/240;100 Amp) 50.00 Each Removal Of Luminaire 40.00 Each Installation Of Luminaire 10.00 Each Luminaire (Led), 150 Watts, Hps Equival 100.00 Each Luminaire (Led), 250 Watts, Hps Equival 10.00 Each Luminaire (Led), 400 Watts, Hps Equival 50.00 Each Luminaire (Led), 640 Watts, Hps Equival 5.00 Each Led Wall Pack, 250 Watts Hps Equivalent 5.00 Each Led Wall Pack, 400 Watts Hps Equivalent 10.00Each Led Wall Pack, 75 Watts Hps Equivalent 5.00 Each Led Wall Pack, 150 Watts Hps Equivalent 100.00 Each Alum Light Std w/ Sing Dav Arm, 30` Pole 50.00 Each Alum Light Std w/ Sgl Dav Arm, 40` Pole 50.00 Each Aluminum Lighting Single Davit Arm, 8` 50.00 Each Aluminum Lighting Single Davit Arm, 12` 50.00 Each Aluminum Lighting Single Davit Arm, 15` 100.00 Each Aluminum Lighting Standard, 30` Pole 100.00 Each Aluminum Lighting Standard, 40` Pole 100.00 Each Alum Light Strd w Single Trus Arm, 30` 100.00 Each Aluminum Lighting Single Davit Arm, 10` 100.00 Each Aluminum Lighting Single Davit Arm, 20` 25.00 Ton Topsoil 750.00 Sy Erosion Control Blanket Mulch 200.00 Sy Turf Reinforcement Matting, Type 1 125.00 Sy Furnishing Sod
Details
Division 10 - Specialties, Signage.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents