Similar Projects
Last Updated | 11/23/2021 03:48 PM |
Project Title | College Center 2021 EOF and CAP Office Renovations |
Physical Address | View project details and contacts |
City, State (County) | Sewell, NJ (Gloucester County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $150,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Renovate the existing EOF and CAP offices as shown on drawings including all general construction, demolition, fire sprinkler modifications, HVAC Ductwork modifications and electrical work. The electrical work includes: a. Provide receptacles, lights, switches, occupancy sensors, circuiting, electrical panel and new breakers. Reference the Electrical Drawings. b. Provide removals and relocations as shown on the Electrical Drawings. Data Systems -Work by the Contractor a. Provide all data outlets, jacks, wiring, cover plates, cables, and testing for all new outlets shown on the plans. Punch down and test all data lines at the Owner-provided punch down block in the second floor IT room. b. In the CAP center, trace and label all of the existing data cabling in addition to providing new data outlets. Data Systems - Work by Owner’s Contractor a. Provide Fiber infrastructure between the first floor Main Computer Room and the Second Floor IT Closet. b. Provide a new data rack in the second floor IT Room with fiber trays and punch down blocks. c. Provide all testing and certifications d. Reference the Electrical drawings at the IT riser diagram on the electrical drawings The existing carpet, ceiling tile and grid are relatively new and are to be protected during construction and remain. At the completion of work, the Contractor shall hire a professional cleaning crew to professionally steam clean the carpets, clean and sanitize all areas inside the suites. The Contractor shall set up loading and work areas so as not to block or hinder egress from or access to the building. Schedule of work sequence: No work can be started until all permits are received. The existing building will be partially occupied. The project must be completed on or before July 30, 2022. The onsite Construction Period shall commence on May 16, 2022. The Work will be constructed under one lump sum prime contract |
||||||||||||||||||||||||||||||||||||||
Details | College/University, Renovation.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |