Similar Projects
Dowling Road and Seward Highway Interchange Reconstruction
New Construction, Infrastructure
Bidding
$30,000,000 to $40,000,000 est. value
Anchorage, AK

Airport Way/Cushman Street Intersection Reconstruction
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
AK

Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

Provide Year-Round Road Maintenance Services for Upper O'Malley Limited Road Service Area
Term Contract, Infrastructure
Post-Bid
Less than $650,000 est. value
Anchorage, AK 99501

Hidden Hills Road Repairs
Infrastructure
Results
Less than $110,000 est. value
Matanuska, AK

Earthquake Repairs - Phase I & II
Infrastructure
Results
$1,500,000 est. value
Whittier, AK

Belair Estates Road Improvements
Infrastructure
Bidding
Less than $540,000 est. value
Palmer, AK 99645

Sterling Highway Mp 45-60 Sunrise to Skilak Lake Rd Reconstruction CM/GC
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value
AK

Design-Build Services for Knutson Drive Critical Repairs
Infrastructure
Results
$800,000 est. value
Sitka, AK 99835

Resurface Old Seward Highway From Dimond Boulevard to Dowling Road
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value

North Road Surfacing
Infrastructure
Results
Kenai, Seldovia, AK 99669

Landlocked Avenue Road Repairs
Infrastructure, Alteration
Results
Matanuska, Willow, AK 99645

Shageluk Airport Access Road Improvements
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Shageluk, AK 99665

Gravel Road Design - Duke Street, St. Andrews Road; Sports Lake Road; Hakala Drive; Cotman Court
Infrastructure
Results
$86,011 est. value
Soldotna, AK 99669

Basargin Road Phase 3 Design
Infrastructure
Results
English Bay, Soldotna, AK 99669

Last Updated 02/16/2022 05:38 AM
Project Title

Old Richardson Highway Intersection Improvements

Physical Address View project details and contacts
City, State (County) AK   (Fairbanks North Star County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve intersections in North Pole at Santa Claus Lane and East 5th Avenue, and North Pole High School Boulevard at Old Richardson Highway and 8th Avenue. Work will include roadside hardware and utilities. The railroad crossings will also be improved to current standards. 10 201.0007.0000 Clearing All Required Lump Sum Lump Sum 20 201.0009.0000 Clearing and Grubbing All Required Lump Sum Lump Sum 30 202.0002.0000 Removal of Pavement 1,365 Square Yard 40 202.0003.0000 Removal of Sidewalk 37 Square Yard 50 202.0009.0000 Removal of Curb and Gutter 54 Linear Foot 60 202.2022.0000 Removal of Fence 84 Linear Foot 70 203.0003.0000 Unclassified Excavation 740 Cubic Yard 80 203.0006.0000 Borrow 560 Ton 90 301.0001.00D1 Aggregate Base Course, Grading D-1 180 Ton 100 304.0001.000F Subbase, Grading F 935 Ton 110 306.0001.0000 ATB 250 Ton 120 306.0002.5228 Asphalt Binder, Grade PG 52-28 11 Ton 130 401.0001.002B HMA, Type II; Class B 130 Ton 140 401.0004.0000 Asphalt Binder, Grade PG 52E-40 6 Ton 150 401.0015.0000 Asphalt Material Price Adjustment All Required Contingent Sum Contingent Sum $0.00 160 401.2010.0000 HMA, Sidewalks and Paths 75 Ton 170 607.0003.0000 Chain Link Fence 85 Linear Foot 180 608.0001.0006 Concrete Sidewalk, 6 inches thick 114 Square Yard 190 608.0006.0000 Curb Ramp 5 Each 200 608.2016.0000 Detectable Warning Tile 20 Square Yard 210 609.0002.0001 Curb and Gutter, Type 1 432 Linear Foot 220 615.0001.0000 Standard Sign 170.42 Square Foot 230 615.0006.0000 Salvage Sign 41 Each 240 618.0002.0000 Seeding 2 Pound 250 620.0001.0000 Topsoil 140 Square Yard 260 639.0001.0000 Driveway 1 Each 270 640.0001.0000 Mobilization and Demobilization All Required Lump Sum Lump Sum 280 641.2000.0000 Pollution Control All Required Lump Sum Lump Sum 290 642.0001.0000 Construction Surveying All Required Lump Sum Lump Sum 300 642.0003.0000 Three Person Survey Party 40 Hour 310 643.0002.0000 Traffic Maintenance All Required Lump Sum Lump Sum 320 643.0003.0000 Permanent Construction Signs All Required Lump Sum Lump Sum 330 643.0023.0000 Traffic Price Adjustment All Required Contingent Sum Contingent Sum $0.00 340 643.0025.0000 Traffic Control All Required Contingent Sum Contingent Sum $47,905.00 350 643.0032.0000 Flagging All Required Contingent Sum Contingent Sum $56,000.00 360 644.0001.0000 Field Office All Required Lump Sum Lump Sum 370 644.0006.0000 Vehicle All Required Lump Sum Lump Sum 380 646.0001.0000 CPM Scheduling All Required Lump Sum Lump Sum Flashing Beacon System Complete, 5th 390 660.0002.0000 Avenue All Required Lump Sum Lump Sum Highway Lighting System Complete, 5th 400 660.0003.0000 Avenue All Required Lump Sum Lump Sum 410 661.0005.0000 Modify Load Center 1 Each 420 670.0010.0000 Methyl Methacrylate Pavement Markings All Required Lump Sum Lump Sum

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents