Similar Projects
Northern Region - Two Phase Design-Build and Construction IDIQ MATOC in Support of DHA
New Construction
Design
$500,000 to $5,000,000 est. value
Watertown, CT

Boiler Replacement, West Thompson Lake
Renovation
Design
$25,000 to $100,000 est. value
Thompson, CT

USN Bldgs. 430 & 434 Fire Alarm Replacements Groton, CT
Build-out, Renovation
Bidding
$300,000 CJ est. value
Groton, CT 06340

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Camp Nett Building at 801 Latrine Renovations
Renovation
Results
East Lyme, CT 06357

AASF Window Replacement
Renovation
Results
$700,000 to $1,000,000 est. value
Hartford, Windsor Locks, CT 06096

Construct Aircraft Support Equipment (ASE) and Vehicle Maintenance (VM) Facility, Bradley Air National Guard Base
New Construction, Infrastructure
Post-Bid
$25,000,000 CJ est. value
East Granby, CT 06026

Building 38 Structural Repairs to Carpentry Shop
Renovation
Results
$250,000 to $500,000 est. value
Groton, CT 06340

EHRM Infrastructure Upgrades, Newington Campus
Renovation
Post-Bid
$20,000,000 CJ est. value
Newington, CT 06111

Building 802 Latrine Renovations
Renovation
Results
$960,400 CJ est. value
East Lyme, CT 06357

Major Repairs Quarters 5, U.S. Coast Guard Academy
Build-out, Renovation
Post-Bid
$3,000,000 CJ est. value
New London, CT 06320

Refinish Drill Shed Hartford Armory
Renovation
Results
$1,281,000 CJ est. value
Hartford, CT 06106

USCG Academy Repair HVAC System ay Yeaton Hall
Build-out, Renovation
Post-Bid
$3,000,000 CJ est. value
New London, CT 06320

RFQ General Contractor - Interior Office/Building and Exterior Renovations Amtrak Maintenance of Way Base
Renovation
Post-Bid
$750,000 CJ est. value
Hamden, CT 06518

Last Updated 03/31/2023 12:04 AM
Project Title

Building 533 Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Groton, CT 06340   (New London County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status No longer Accepting Requests, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

NAVFAC Specification Work Order No: 1690300 Title: Building 533 Cooling Tower Replacement Location of Work: Naval Submarine Base New London, Groton CT Description of Work: Design, provide, and commission new closed circuit evaporative coolers (CCEC), condenser pump, building circulation pumps, chemical-free condenser water treatment and bypass valves/piping at each floor loop for B533. (Attachment A) FAR 36.204-(f) Disclosure of Magnitude of construction: $1,000,000 to $5,000,000. NAICS Code: 236220 FSC/PSC: Z1CZ Time for completion: All work shall be completed within 270 calendar days after contract award. The price shall be held at least 90 days. Wage Determination: The following Department of Labor (DOL) General Wage Decisions applies to this Task Order: General Decision Number: CT20220024 MOD 01 dated 1/13/2023 (Attachment C). Should these wage determinations be updated by the DOL prior to award, the most current wage determination will be incorporated at time of award. Clauses Incorporated by Reference 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020) 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) 52.211-15 Defense Priority and Allocation Requirements (APR 2008) 52.228-5 Insurance-Work on a Government Installation (JAN 1997) 52.228-15 Performance and Payment Bonds - Construction (OCT 2010) 52.246-12 Inspection of Constructions (AUG 1996) 252.204-7006 Billing Instructions (OCT 2005) 252.232-7006 Wide Area Work Flow Payment Instructions (DEC 2018) Clauses Incorporated by Full Text: 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (OCT 2020) - Provision is attached. Complete representation and return with proposal. 52.211-12 Liquidated Damages--Construction (SEP 2000) (a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,763.00 for each calendar day of delay until the work is completed or accepted. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents