Similar Projects
Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

El Cajon Branch Library
New Construction, Infrastructure
Conception
$30,300,000 est. value
El Cajon, CA 92020

Site Prep SPS Sterilizers and Equipment - Building 126 - 7th Floor
Renovation, Alteration
Design
Long Beach, CA 90822

Upgrade Domestic Hot and Cold Water Systems
Term Contract
Design
$5,000,000 to $10,000,000 est. value
San Diego, CA 92161

Fire Service Detector Check Valves
Infrastructure
Bidding
Oakland, CA

Electrical Motors Overhaul Services
Term Contract
Bidding
San Diego, CA 92106

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Roadway Excavation, HMA (Type A), Culvert Work and RSP
Infrastructure
Results
$4,860,000 est. value
CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Ac Water Group 1027A - City Of San Diego
Alteration
Conception
$900,000 est. value
San Diego, CA 92101

Camarillo Hills Drain Replacement
Infrastructure
Design
Less than $12,760,000 est. value
Camarillo, CA 93011

Pipeline 5 Relining, North Twin Oaks Valley Road to Crossover Pipeline Turnout
Infrastructure
Bidding
$27,000,000 est. value
San Diego, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Last Updated 06/22/2022 09:17 AM
Project Title

Park Ave and El Centro Highway Crossings Construction - WD25UT03 - City of Napa

Physical Address View project details and contacts
City, State (County) Napa, CA   (Napa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design of water main crossings under Highway 29 at Park Ave and El Centro. When constructed the project will use directional drilling technique to replace existing undersized 4-inch and 6-inch sections of pipeline with approx. 450 lf of 12-inch pipe completing tie-ins to 12-inch segments on Solano and Jefferson. This connects the secondary backbone of the system through this area to enable flow when a transmission main is out of service. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of June 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents