Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

HVAC and Mechanical Products
Term Contract
Post-Bid

Robert Crown Center HVAC Maintenance
Post-Bid
Evanston, IL 60202

Geothermal Leak Repair - Goode High School
Results
Chicago, IL 60652

Replacement of Rotunda Air Handling Units
Results
Chicago, IL

River Valley RTU Replacement in Lemont
Post-Bid
Chicago, Lemont, IL 60439

Filter Backwash Valve With Hydraulic Actuator
Demolition, Term Contract
Results
Evanston, IL

Upgrade Mechanical Systems
Post-Bid
Less than $250,000 est. value
River Grove, IL 60171

Building X: AHU-2 Fan Array Retrofit
Results
Palatine, IL

Building Automation Systems-Wentworth
Term Contract
Post-Bid
$250,000 est. value
Chicago, IL 60609

Bridge Elementary School Outside Air Dampers
Results
Chicago, IL 60634

Building Automation Systems-Flannery
Term Contract
Post-Bid
$250,000 est. value
Chicago, IL 60612

Kennedy HS Air Damper and Actuator Replacement (VT Pool)
Results
Chicago, IL 60638

Classroom Air Conditioning and Electrical Renovations
Renovation
Post-Bid
IL

HVACR Services - Ice Refrigeration Equipment
Results
Northbrook, IL 60062

Last Updated 07/12/2022 12:53 AM
Project Title

North Condensing Unit 3

Physical Address View project details and contacts
City, State (County) Chicago, IL 60623   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location Ortiz De Dominguez 3000 South Lawndale Chicago, IL 60623 Scope of Work Reclaim the existing refrigerant; Disconnect and remove existing condensing unit #3; Install one new 20 ton condensing unit; Disconnect and remove the existing evaporator coil serving air handling unit #3 Install one new evaporator coil; Install one new line set; Pipe and wire the new condensing unit and evaporator coil; Pull a vacuum; Charge the unit with R410A; and Check for proper operation when complete and return to service.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents