Similar Projects
Trout of Paradise Pavilion
New Construction - 1,000 SF
Conception
Less than $500,000 CJ est. value
Paradise, UT 84328

Sunnyvale Park Improvements
Bidding
$300,000 to $400,000 est. value
Millcreek, UT

Lindsey Gardens Concession and Pedestrian Access 426 M Street
New Construction
Bidding
$1 to $415,000 est. value
Salt Lake City, UT 84103

Sand Hollow RV Resort
New Construction
Sub-Bidding
Hurricane, UT 84737

Kay’s Creek / D and RGW Trailhead
Post-Bid
Less than $100,000 est. value
Layton, UT 84041

Lehi City Park Playgrounds
Post-Bid
Lehi, UT 84043

Lakeview Parkway-Phase I
Results
Provo, UT

Yankee Meadows Campground Reconstruction
Results
$1,000,000 to $5,000,000 est. value
UT

Cherry Creek, Richmond 1, 3 Ward Parking Lot Addition
Renovation
Construction
Richmond, UT 84333

Skyline High School Baseball Field
Construction
East Millcreek, UT 84109

Stephens South Weber
New Construction - 47,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
South Weber, UT

Taylorsville Mixed Use
New Construction - 40,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Taylorsville, UT

Fisher Mansion Carriage House River Recreation and Community Engagement Hub
Bidding
$1 to $1,359,762 est. value
Salt Lake City, UT 84104

Spanish Fork City`s All Ability Park
Post-Bid
Spanish Fork, UT 84660

Willow Creek Park Court Resurfacing
Results
Park City, UT 84098

Last Updated 07/01/2020 01:13 PM
Project Title

Running Track Repair Grantsville High School

Physical Address View project details and contacts
City, State (County) Grantsville, UT 84029   (Tooele County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair services shall include but not be limited to the following: * Properly fill in and repair and crack, gouges or other damaged areas of the track wear surface and base mat. * This includes repairing asphalt substrate that may have failed causing the damage above. * Clean and prepare track and event areas for resurfacing. * Cut back grass around the track, long jump runway, and high jump as needed. * Reapply basemat layer where/if needed. * Respray top wear coat with appropriate and compatible material. * Repaint lines and markings on track. * Coordinate with school regarding required lines and markings. * Protect surrounding area from overspray as required.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents