Similar Projects
Dike & Revetment - USACE St. Louis District
Design
$15,000,000 est. value
Cairo, IL

Chicago Harbor Lock Chamber Floor and Wall Repair
Renovation
Design
$25,000,000 to $100,000,000 est. value
Chicago, IL

Drop Shaft Modifications and Collection Facilities
Renovation
Bidding
$4,512,500 to $5,462,500 est. value
Des Plaines, IL 60016

Hennings Subdivision Completion of Infrastructure Contract C Stormwater Management
Infrastructure
Bidding
Huntley, IL

Mel Price Lift Gate Replacement
Post-Bid
Alton, IL

Waukegan Harbor Breakwater Repairs, Waukegan, Lake County, Illinois
Post-Bid
$1,000,000 to $5,000,000 est. value
Waukegan, IL

Illinois River Basin Miter Gate Replacement
Results
$5,000,000 to $10,000,000 est. value
Joliet, Morris, IL

Illinois River Basin Miter Gate Replacement
Results
$5,000,000 to $10,000,000 est. value
Joliet, Morris, IL

Chicago Harbor Lock Power Distribution Upgrades
Renovation
Design
$250,000 to $500,000 est. value
Chicago, IL 60604

Locks 27 Miter Gate Anchorages Replacement
Renovation, Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Granite City, IL 62040

Mel Price Main Lock Overlook Alterations
Renovation
Post-Bid
Alton, IL 62002

Hammel Woods Dam Modification
Results
Shorewood, IL 60431

Illinois River Basin; Brandon Road Lock, Will County, Il, Upper Bulkhead Recesses
Renovation
Post-Bid
$10,000,000 est. value
IL

McKinley Woods Preserve Bridge Over the I and M Canal Improvements
Results
Less than $170,000 est. value
Channahon, IL 60410

MPLD Main Lock Overlook Alterations
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
East Alton, IL

Reported 02/04/2022 12:00 AM
Project Title

Lock and Dam 21 Concrete Repairs

Physical Address View project details and contacts
City, State (County) Quincy, IL   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Requirements: This project will include replacement of the upstream kevel rail and traveling bitt, replacement of checkposts on the upstream guidewall, replacement of checkposts on the downstream guidewall, horizontal resurfacing on the downstream guidewall, metal walkway on downstream guidewall, horizontal resurfacing on land wall, and vertical joints on land wall in lock chamber. Work is anticipated to take place during a 60-90 day closure.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents