Similar Projects
Montessori Children's House of Denver
New Construction - 38,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Denver, CO

RiNo Art District
Renovation
Conception
Denver, CO 80205

Watershed
New Construction, Build-Out - 180,000 SF
Design
$72,000,000 est. value
Denver, CO 80216

Harvard Gulch West Trail (Elevate Denver Bond)
Design
Denver, CO

Furnish and Installation of Basketball Backstops with Removal of Existing Equipment
Post-Bid
Denver, CO 80202

Metzler Ranch Park Dugout Construction
Post-Bid
Castle Rock, CO 80104

Eastonville Regional Trail
Results
Colorado Springs, CO 80900

Harlow Park Improvements
Results
$850,000 to $890,000 est. value
Littleton, CO 80123

Design/Build Services for Tennis Courts
Construction
Colorado Springs, CO 80920

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Meadows Community Center Playground Replacement
Post-Bid
Colorado Springs, CO 80905

CO FLAP SUM 91(1), Fremont Pass Trail
Results
$3,000,000 to $5,000,000 est. value
Frisco, CO 80443

Dry Lake Campground & Road Rehabilitation
Design
Steamboat Springs, CO

Playground Engineered Wood Fiber Installation
Post-Bid
Greeley, CO 80631

CO FLAP DEN 56(1) Access Connections to ROAR
Results
$3,000,000 to $4,000,000 est. value
Commerce City, CO

Last Updated 11/03/2020 12:45 PM
Project Title

Packy Romans Park Improvement Project Phase 2

Physical Address View project details and contacts
City, State (County) Englewood, CO 80110   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes: • Demolition and removal of existing restroom building, picnic shelter, basketball court surface, subgrade and equipment, asphalt and concrete paving and affected landscape • Installation of a prefabricated flush restroom and plumbing connections to existing utilities • Installation of a basketball half-court with a post-tension concrete surface, equipment and acrylic surfacing • Installation of a new picnic shelter, concrete pad and site furnishings • Installation of an adult fitness area and slackline posts. • Grading and flatwork for new sidewalk areas and the installation of new curbs, ramps, walls, and equipment • New landscaping • Minor irrigation retrofit repair and sod reinstallation.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Athletic and Recreational Special Construction, Building Modules, Bathroom Unit Modules.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents