Similar Projects
Corpyard - Green Room Lockers, Bathroom, Training, Room, Floor, Cabinets - Building B - PWT1CB2209 - City of Berkeley
Renovation, Infrastructure
Conception
$1,425,000 est. value
Berkeley, CA

Laney College Waterproofing Repairs - Phase III
Alteration
Post-Bid
Oakland, CA 94607

PWA Roof Restoration
Alteration
Post-Bid
Hayward, CA 94544

CHP Oakland Area Office Roof Replacement Services
Term Contract
Results
$150,000 est. value
Oakland, CA 94609

Senior Center Flat Roof Replacement Project
Alteration
Results
$150,000 est. value
Fremont, CA 94538

Winton Avenue New Roof
Infrastructure
Post-Bid
Hayward, CA 94544

Roofing Work San Mateo County and Hayward Shop
Renovation
Results
$850,630 CJ est. value
Oakland, CA 94612

Turner Court Roof Replacement
Alteration
Post-Bid
Hayward, CA 94545

Library Roof Replacement
Renovation, Alteration - 43,500 SF
Results
$4,000,000 est. value
Pleasanton, CA 94566

Animal Shelter Roof
Alteration
Post-Bid
Dublin, CA 94568

District Wide Roofing and HVAC Replacement Project Package Five
Alteration
Post-Bid
Pleasanton, CA 94566

900 High Street Roofing Replacement
Alteration
Post-Bid
$150,000 est. value
Oakland, CA 94601

Dublin Roof Repair
Alteration
Post-Bid
$250,000 to $500,000 est. value
Dublin, CA

CHP Oakland Roof Maintenance
Alteration
Post-Bid
Oakland, CA 94609

WWTP Roof Replacements
Alteration
Post-Bid
$330,000 est. value
Dublin, CA

Last Updated 11/15/2022 11:13 AM
Project Title

Roof Replacement at Corporation Yard

Physical Address View project details and contacts
City, State (County) Hayward, CA 94544   (Alameda County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $556,800 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 1, 2022 , this project has not yet been awarded. The project is expected to be awarded on Nov. 9 , 2022.** Replace designated roofs and perform miscellaneous work as outlined in the drawings and specifications. Bid Bond: 10% Performance Bond: 100% Payment Bond: 100% The successful Bidder and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to Labor Code 1770 et seq The project is anticipated to start June 12, 2023 and complete on August 11, 2023 - 60 Calendar days. The intent of bidding the project at this time is for the contractor to procure all materials to assure the schedule timelines can be met.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents