Similar Projects
WWTP Liner Replacement
Infrastructure
Bidding
$531,000 CJ est. value
Elgin, IA 52141

2023 Storm Sewer Improvements, Contract 1-2023,
Infrastructure
Bidding
$500,000 CJ est. value
Cambridge, IA 50046

Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

Springreen Apartments Water Main Improvement Project
Infrastructure
Results
$113,984 CJ est. value
Asbury, IA 52002

Country View Heights North Addition Phase II
Addition, Infrastructure
Bidding
$750,000 CJ est. value
Sioux Center, IA 51250

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Wastewater Reclamation Facility Belt Filter Press Improvements
Renovation
Results
$1,991,800 CJ est. value
Des Moines, IA 50317

1st Street Water Main Replacement From Liberty St to Chestnut St
Infrastructure
Bidding
$580,000 CJ est. value
Wilton, IA 52778

WWTP Vertical Loop Reactor Replacement Air Piping
Infrastructure
Post-Bid
$390,000 CJ est. value
Carroll, IA 51401

VA District - Phase 1 Improvements
Infrastructure
Results
$3,346,000 CJ est. value
Knoxville, IA 50138

2022 Stormwater Intake Repair Program
Infrastructure
Post-Bid
$295,867 CJ est. value
Des Moines, IA 50315

Chemical Building
New Construction, Infrastructure
Results
$1,707,000 CJ est. value
Eagle Grove, IA 50533

Time and Material (NTE), Commercial Plumbing Contracting
Term Contract
Post-Bid
Ames, IA 50010

Last Updated 05/23/2023 01:04 PM
Project Title

Pool Backwash Drain Improvements

Physical Address View project details and contacts
City, State (County) Oelwein, IA 50662   (Fayette County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $173,173 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The bidder's security shall be in the amount of 5% of the total bid amount including all add alternates and shall be the Jurisdiction's bidder's bond with corporate surety satisfactory to the Jurisdiction. No other type of bid security will be accepted. The bidder's bond shall contain no condition except as provided in the specifications. The successful bidder will be required to furnish a construction performance, payment, and maintenance bond in an amount equal to one hundred percent (100%) of the contract price. Said bonds to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and the maintenance of said improvements in good repair from the time of acceptance of the improvements by the City for not less than two (2) years. Contractor shall fully complete by July 28, 2023, except for seeding, which shall be completed by August 31, 2023. Liquidated Damages in the amount of $600.00 per Calendar Day will be assessed for each Calendar Day that any work shall remain uncompleted beyond July 28, 2023, except for seeding, which shall be completed by August 31, 2023.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents