Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Installation of Needlepoint Bipolar Ionization Units Phase III 37 CMS Sites
Alteration
Bidding
Charlotte, NC 28208

Loyd Auman Elementary School HVAC Upgrade
Alteration
Bidding
Fayetteville, NC 28304

Heat Controller Install
Post-Bid
Chapel Hill, NC 27516

Parkwood Elementary School Chiller Replacement
Post-Bid
Durham, NC 27713

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

Legacy and Jones Residence Halls Make-up Air
Results
Less than $1,655,170 est. value
Greenville, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

Endimal Chemical Feed
Infrastructure, Alteration
Bidding
$120,000 est. value
Greensboro, NC

Infrastructure Project STEAM-2
Renovation
Post-Bid
Hendersonville, NC 28739

EMD Facility HVAC Upgrades
Results
Wilmington, NC

State Government Complex Chiller Plant
Alteration
Bidding
$21,875,000 est. value
Raleigh, NC

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

Cooler and Freezer Restoration at Durham County Detention Center
Term Contract
Results
Durham, NC 27701

Rockfish Elementary School HVAC and Window Replacement
Alteration
Bidding
Hope Mills, NC 28348

Reported 01/07/2022 12:00 AM
Project Title

North Campus Building N105 AHU 3 Replacement

Physical Address View project details and contacts
City, State (County) Salisbury, NC   (Rowan County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency - 10/20/21
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work for this project. 1. Remove existing AHU-3, ductwork, and piping. 2. Install new AHU-3 and connect to existing ductwork and piping 3. Remove insulation from existing ductwork and piping in mechanical room and replace. 4. Insulate all new piping and ductwork. 5. Provide new control sensors, CO2 sensor, and control valves. 6. Program the new AHU-3 into the existing control system. 7. All demolished equipment and materials to properly disposed of. 8. Disconnect and remove power wiring to existing AHU-3 being removed. All unused conduit and wiring to be removed and properly disposed of. 9. Modify existing panel "LM" to accommodate the new AHU-3. 10. Make connection to new variable frequency drive and AHU-3. 11. Remove existing duct smoke detector from existing return air duct. 12. Provide new duct smoke detector in existing return air duct at existing smoke detector location. Provide new remote monitor/test switch in Mechanical Room. Connect new duct detector to existing building fire alarm system. 13. Provide new labeling per College guidelines. HUB certified contractors are encouraged to submit a bid for this project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents