Similar Projects
Family Dollar - North N Street / Pensacola
New Construction, Infrastructure - 9,180 SF
Conception
$2,500,000 CJ est. value
Pensacola, FL 32501

Family Dollar - North N Street / Pensacola
New Construction, Infrastructure - 9,180 SF
Conception
$2,500,000 CJ est. value
Pensacola, FL 32501

Dollar General #24239 / Molino
New Construction, Infrastructure - 10,670 SF
Design
$1,000,000 CJ est. value
Molino, FL 32577

Dollar General #24239 / Molino
New Construction, Infrastructure - 10,670 SF
Design
$1,000,000 CJ est. value
Molino, FL 32577

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Design-Bid-Build Paving Indefinite Delivery Indefinite Quantity Single Award Construction Contract for the Naval Air Station Pensacola Florida Area of Responsibility
Results
$15,000 to $1,000,000 est. value
Pensacola, FL 32508

Muldoon Granular Activated Carbon (GAC) Filter Piping
Infrastructure
Results
$1,281,890 CJ est. value
Pensacola, FL 32501

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

O'Reilly Auto Parts (PN7) #6651 / Pensacola
New Construction, Infrastructure - 7,453 SF
Construction
$500,000 CJ est. value
Pensacola, FL 32506

Moreau Duplexes
New Construction, Infrastructure - 45,700 SF
Pending Verification
$12,500,000 CJ est. value
Pensacola, FL 32506

Moreau Duplexes
New Construction, Infrastructure - 45,700 SF
Pending Verification
$12,500,000 CJ est. value
Pensacola, FL 32506

OLF-8 Property
New Construction, Infrastructure
Conception
$60,000,000 CJ est. value
Pensacola, FL 32526

Hurricane Sally Repairs for Myrtle Grove Fire Station
Infrastructure
Design
$840,000 CJ est. value
Pensacola, FL 32506

RFP - Continuing Services Traffic Operations Design Consultant
Term Contract
Post-Bid
$5,000,000 CJ est. value
Santa Rosa Beach, FL 32459

Last Updated 07/13/2023 07:31 AM
Project Title

Barrancas Avenue E Street to L Street Drainage Improvements

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32502   (Escambia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000323922 The northernmost right of way and travel lane of Barrancas Avenue experienced issues with standing stormwater issues as well as water overtopping the curb. This is due to the existing stormwater conveyance system being undersized for its contributing basin's flow. This project will serve to increase the flow capacity of the conveyance system by installing additional inlets and upsizing the existing stormwater piping. As a bid alternate, the right of way will be fitted with bioretention cells to collect water from the travel lane. These bioretention cells no only provide relief for the overtaxed system but also provide stormwater treatment for a currently untreated drainage sub-basin within the Bayou Chico Watershed. As an additional bid alternate, this project is slated to incorporate new ECUA-owned sanitary sewer infrastructure at the Barrancas Ave and Main Street intersection. As a result of these improvements, work site safety, MOT, dewatering, maintenance/bypass of stormwater flow, and erosion control will be paramount issues. General work to be accomplished will include installation of new storm structures, new storm pipe, curb and gutter and sod. The LS Maintenance of Traffic item shall include all signs, devices and other cost associated with maintaining traffic during the project. While not anticipated or required, contractor may elect to perform portions of this project as night work. In the area of intersection with existing asphalt, pavement interface shall be saw cut and the perimeter milled to provide a clean seam between existing and proposed asphalt. Care shall be exercised to not cause any damage to adjacent infrastructure being left in-place during reconstruction. Any such damage shall be the responsibility of the contractor. All grade work and elevations shall reflect the design information provided in the construction plans. All proposed line and grade work shall be approved by the City Inspector. Contractor's work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work. All sod placed shall be properly watered and maintained until permanently rooted/established to the satisfaction of the City. Maximum access shall be provided to the property and business owners at all times during construction. Due to the nature of the project, it is required that bidders visit the site and thoroughly review the plans and specifications. All work shall be in accordance with the standards and specifications of the City of Pensacola. Bonding Requirements - Bid Bond 5 % Question Deadline 07/17/2023 at 10:00 AM CT Questions are submitted online No Any questions concerning the solicitation should be addressed and submitted in writing no later than , to Dedria Lunderman, Assistant Purchasing Manager, City of Pensacola, 222 W. Main St., Pensacola, FL 32502 or at purchasing@cityofpensacola.com. Prospective bidders/respondents are hereby cautioned not to contact any member of the City of Pensacola staff or officials other than the specified contact person. Questions are submitted online No

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents