Similar Projects
Walmart Supercenter #5389-251 - D80 BLST CHIL
Renovation - 208,418 SF
Design
Waco, TX 76643

Family Dollar - East Highway 287 (TI Upfit)
New Construction, Infrastructure - 10,500 SF
Design
$150,000 CJ est. value
Alvord, TX 76225

US 380 - Rehabilitate Existing Roadway
Infrastructure
Bidding
$2,699,567 CJ est. value
Decatur, TX 76234

FM 730 Utility Relocations - Phase II
Infrastructure
Bidding
$420,000 CJ est. value
Boyd, TX 76023

Lowe's Tool Rental Center
Addition - 4,000 SF
Post-Bid
$500,000 est. value
Decatur, TX

Walmart Supercenter #421-608 - CAPXREF-1
Renovation
Post-Bid
Decatur, TX

Excavation Improvements for Bluestem, Phase 1
Results
TX

Hydro Excavation Services
Infrastructure
Results

Starbucks - Shell Building
New Construction - 2,200 SF
Construction
$500,000 est. value
Bridgeport, TX

Whataburger / Bridgeport
New Construction, Infrastructure - 2,974 SF
Construction
$2,700,000 CJ est. value
Bridgeport, TX 76426

QuikTrip #1873 / Rhome
New Construction, Infrastructure - 7,318 SF
Pending Verification
$750,000 CJ est. value
Rhome, TX 76078

Cefco #0111 Decatur Texas
New Construction, Infrastructure - 6,000 SF
Pending Verification
$878,500 CJ est. value
Decatur, TX 76234

Murphy #6528/7859 /Decatur
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$2,000,000 CJ est. value
Decatur, TX 76234

The Paving, Utility, and Street Light Improvements for Shale Creek, Phase 3B
Infrastructure
Bidding
$500,000 CJ est. value
Rhome, TX 76078

Walmart Supercenter #163-607 - CAPXHVAC-3
Renovation
Post-Bid
Nacogdoches, TX 75965

Last Updated 09/16/2022 01:09 PM
Project Title

Bridgeport #102433 / Allsup's

Physical Address View project details and contacts
City, State (County) Bridgeport, TX 76426   (Wise County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 16, 2022, plans have not been submitted for permitting. A general contracting method has not been disclosed. Construction is expected to begin December 2022 and be completed April 2023.

Details

5,630 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents