Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Municipal Swimming Pool - City Of Canton
Renovation, Infrastructure
Design
$4,281,000 CJ est. value
Canton, SD 57013

Lennox 2021 Street Improvements
Infrastructure
Post-Bid
$620,000 est. value
Lennox, SD

Phase 2 Grading Project - Central Park
Infrastructure
Post-Bid
$350,000 est. value
Harrisburg, SD

Citywide Water Main Improvements - West 66th Street, Sundowner Avenue to Holbrook Avenue, Cipp Water Main Lining
Results
Less than $1,300,000 est. value
Sioux Falls, SD 57106

49th Street Extension-Western Avenue to West Avenue
Infrastructure
Results
$2,665,682 est. value
Sioux Falls, SD

Pinnacle Estates Addition
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Tea, SD 57064

The Crossroads Mixed Commercial Development
New Construction, Demolition, Infrastructure
Pending Verification
Sioux Falls, SD

High School Expansion - 2022 Bond - Tea Area School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$39,000,000 CJ est. value
Tea, SD 57064

Foundation Park North Addition - Phase 1 Mass Grading
Infrastructure
Post-Bid
Sioux Falls, SD

Sioux Empire Development Park 8 - Phase 3 Mass Grading
Infrastructure
Results
Sioux Falls, SD

Underground Infrastructure Inspection
Infrastructure
Post-Bid

2022 Lennox Street Improvements - Ash Street and South Main Street
Infrastructure
Results
$1,140,000 est. value
Lennox, SD 57039

Stencil Group Site Improvements
Alteration
Post-Bid
Sioux Falls, SD

Madison Service Line Segment 2/3A Project
Infrastructure
Results
$18,000 est. value
Tea, SD

Last Updated 08/18/2022 06:34 AM
Project Title

Highway 18 Pipeline Relocation Project Schedule 1: Pipeline

Physical Address View project details and contacts
City, State (County) Canton, SD 57013   (Lincoln County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,170,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project shall consist of the following work and approximate quantities and kinds of materials: Construction of approximately 7 miles of 8-inch pipe along US Highway 18, directionally drilled crossings, mainline valves, flushing hydrants, service connections, and other appurtenant work to complete the project. A. The GENERAL, SUPPLEMENTAL, and other CONDITIONS of the Contract are hereby made part of this Section. B. This Section presents a summary of the intended Work and the Contractor's duties and use of premises. Est. Completion Date: Dec. 2, 2022

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents