Similar Projects
Y--GAOA Stellar Creek Road Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

Miles City Hatchery Pond Liner Replacement Project
Infrastructure
Bidding
$1,680,000 est. value
Miles City, MT

Miles City Hatchery Pond Kettle Replacement and Repair Project
Infrastructure
Bidding
$1,100,000 est. value
Miles City, MT

Lake Elmo C Fluminea Eradication
Infrastructure
Post-Bid
$494,506 est. value
Billings, MT 59105

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Post-Bid
MT

Lake Elmo Dewatering Project
Infrastructure
Results
Billings, Helena, MT 59105

Lake Elmo Dewatering Project
Infrastructure
Results
Billings, Helena, MT 59105

Milwaukee Roundhouse CECRA Facility Passenger Refueling Area (PRA) 2021 Soil Removal Action
Infrastructure
Post-Bid
Deer Lodge, MT

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Casting Pond Improvements
Infrastructure
Post-Bid
West Yellowstone, MT 59758

106 US-12 Culvert - East of Baker
Infrastructure
Results
$759,515 est. value

Grading, Gravel Surfacing, Plant Mix Surfacing, Bridge Replacement, Guardrail installation, Drainage, Signing and Pavement Markings
New Construction, Infrastructure
Results
MT

Grade, Gravel, Plant Mix Surfacing, and Seal and Cover on US-HWY 89
Infrastructure
Results
MT

Culvert Replacement, Mill and Overlay, Seal and Cover, Rumble Strips, Guardrail, Signing, and Pavement Markings on the Brockton-West
Infrastructure
Results
MT

Repair/Replacement of 8 Failing Culverts that Carry Kelly Creek or Roadside Drainage Under Us-2 on the Us-2 Culverts-SW of Marion Project Located in Flathead County
Infrastructure
Results
MT

Reported 02/11/2022 12:00 AM
Project Title

DNRC at Sanders Brock Creek Stock Water Project

Physical Address View project details and contacts
City, State (County) Philipsburg, MT 59858 (Granite, Powell Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To install three separate stock water pipeline systems, in two locations in Granite and Powell Counties, Montana. The solar-powered system at the North Fork Spring Creek location is in Granite County in section 16 T7N R15W. This section is located approximately 10 miles west of Philipsburg on Highway 348. The spring developments at the Brock Creek location are in Powell County in Section 16 T10N R10W. This section is located approximately 3 miles north of the Phosphate exit along Brock Creek Road. The site also can also be accessed by the Carten Creek Road off the Gold Creek exit and is located three miles north of Interstate 90.

Details

Division 26 - Electrical.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 48 - Electrical Power Generation, Solar Energy Electrical Power Generation Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents