Similar Projects
Central Division - Asphalt Paving Maintenance
Post-Bid

Paving & Site Lighting
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Wendell Avenue Improvements Project
Results
Hartford, MI 49057

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

0.38 MI of Roadway Reconstruction including Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb and Gutter
Results
Hartford, MI

2021 Chip Seal and Fog Street Preservation Project
Infrastructure
Post-Bid
Less than $150,000 est. value
Lawton, MI

0.51 MI of Hot Mix Asphalt Base Crushing, Shaping and Resurfacing, Concrete Curb, Gutter, Sidewalk and Ramps
Results
MI

0.52 Mi of Hot Mix Asphalt Crushing, Shaping and Resurfacing, Concrete Curb and Gutter, Storm Sewer and Pavement Markings on Pine Street From Main Street to the North Village Limits of Breedsville
Infrastructure
Post-Bid
MI

1.20 MI of Hot Mix Asphalt Widening, Crushing, Shaping and Resurfacing
Results
Bloomingdale, MI

0.50 Mi of Hot Mix Asphalt Cold Milling and Surfacing, Shoulders, Concrete Sidewalk and Ramps and Pavement Markings on Saint Joseph Street From Paw Paw Street to the East Village Limits in the Village of Lawrence
Infrastructure
Post-Bid
MI

Calumet-Swedetown Trail Capping, And Route Grading
Results

1.79 Mi of Hot Mix Asphalt Cold Milling and Resurfacing and Pavement Markings on Two Ramps at i-196 Exit 13 (32nd Street) and Exit 18 (m-140)
Infrastructure
Post-Bid
MI

0.26 MI of Hot Mix Asphalt Reconstruction, Streetscape
Results
Paw Paw, MI

South George Street Improvements
Infrastructure
Post-Bid
$400,000 est. value
Decatur, MI 49045

Reported 05/05/2022 12:00 AM
Project Title

Industrial Park Drive Reconstruction Project

Physical Address View project details and contacts
City, State (County) Bangor, MI   (Van Buren County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of full depth pavement removal and resurfacing of Industrial Park Drive from Arlington Street to 60th Street along with the installation of gravel shoulders and minor utility improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents