Similar Projects
Commonwealth Avenue Mixed-Use
Demolition, New Construction, Infrastructure - 183,800 SF
Conception
$25,000,000 CJ est. value
Boston, MA 02134

7 Channel Center
Addition, Demolition, New Construction, Infrastructure - 99,500 SF
Conception
$15,000,000 CJ est. value
Boston, MA 02210

Washington Street Mixed-Use Development
Addition, Demolition, New Construction, Renovation, Infrastructure - 26,626 SF
Design
$21,300,000 CJ est. value
Boston, MA 02130

Neponset Wharf
New Construction, Infrastructure - 38,400 SF
Design
$90,000,000 CJ est. value
Boston, MA 02122

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Post-Bid
$20,000,000 CJ est. value
Boston, MA 02203

24 Drydock Avenue / Boston
Demolition, New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Boston, MA 02210

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

JFK-Varo Re-Alignment Construction Project (14Th-16Th Floors)
New Construction, Renovation, Demolition
Results
$10,000,000 est. value
Boston, MA

NEXUS at the Allston Innovation Corridor
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Boston, MA 02134

515-519 E. 2nd Street Residential Development
New Construction, Infrastructure
Construction
$13,000,000 CJ est. value
Boston, MA 02127

Residences at Readville Station
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Boston, MA 02136

Soldiers Field Road Residential Development
New Construction, Infrastructure - 14,500 SF
Pending Verification
$198,000,000 CJ est. value
Boston, MA 02135

Garden Cemetery - Phase 5 - City of Chelsea
New Construction, Infrastructure
Conception
$450,000 est. value
Chelsea, MA 02150

High Street Residential Development
New Construction, Infrastructure - 30,444 SF
Design
$4,207,243 CJ est. value
Boston, MA 02122

Engine 17 - GC Bid
Renovation
Post-Bid
$17,754,239 CJ est. value
Boston, MA 02203

Last Updated 10/12/2023 09:31 PM
Project Title

Umass Boston Phase 1B Masonry Repair Project - GC

Physical Address View project details and contacts
City, State (County) Boston, MA 02125   (Suffolk County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $6,135,700 [brand] Estimate
Plans Available from Copy Center - 09/27/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Phase 1B Masonry Repair Project encompass the removal of existing brick as noted, abatement of existing waterproofing, repairs to concrete and masonry back up wall, installation of new brick at the existing substructures under McCormack, Wheatley, and parts of Quinn buildings. All questions by prospective bidders must be submitted in writing via email to mboyle@umassp.edu. The work to be done under this contract consists of executing and completing all work required for the University of Massachusetts Building Authority's Phase 1B Masonry Repairs UMBA Project # 22-B2 at UMass Boston. The Phase 1B Masonry Repairs Project includes the removal of existing brick and CMU as noted, abatement of existing dampproofing, repairs to concrete and masonry back up walls, installation of new CMU back up walls, installation of new waterproofing, and installation of new brick at the existing substructures at McCormack, Wheatley and parts of Quinn buildings. Work shall also include removal and reinstallation of utilities to facilitate installation of new construction, site work, and obtaining all necessary licenses, permits, and certificates. Where utilities exist within and adjacent to the building(s) and ancillary parking lots, and are known by the Owner, they have been shown on the site plan(s) appearing in, but not restricted to, the exhibits. Connections to these existing utility lines will be the responsibility of the Contractor. Question Deadline 10/16/2023 at 2:00 PM ET Questions must be submitted in writing to jlemire@umassp.edu.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents