Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Wastewater Treatment Facility
New Construction, Infrastructure
Bidding
Summerfield, IL

Anthracite Filter Media 2022-2023
Term Contract
Bidding
Waukegan, IL

Levee 37 Pump Station Upgrade (USACE Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Mount Prospect, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Crowe, Elk and Stewart Street Lift Station Improvements
Results
Less than $1,100,000 est. value
Geneseo, IL 61254

First Street Water Treatment Plant Brine Tank Replacement
Renovation
Results
Less than $480,000 est. value
Woodstock, IL 60098

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Jackson Creek Lift Station Improvements
Renovation
Bidding
Frankfort, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

NSWRD Pumping Station Revetment and Groin Restoration
Results
Green Oaks, Lake Bluff, IL 60044

Pump Station Replacement Project
Renovation
Bidding
Germantown Hills, IL

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Pump Station Repairs at the Venice Deep Wells
Results
Venice, IL

Northwest Pump Station Replacement
Renovation
Bidding
San Jose, IL

Reported 03/04/2022 10:38 AM
Project Title

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District

Physical Address View project details and contacts
City, State (County) Roxana, IL   (Madison County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The U. S. Army Corps of Engineers, St. Louis District, Wood River Levee District is seeking a firm for construction of installation of two (2) pump stations and two (2) relief wells. The two (2) relief wells are D-type, 10-inch diameter and approximately 65 feet deep. Relief Well construction will include riser pipe, well screen, filter pack, well development and well testing. The two (2) proposed pump stations will be soil founded with each station having a discharge range under 30 CFS.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents