Similar Projects
Panelboard and Motor Starter Installation
Term Contract
Bidding
Lake Placid, NY 12946

Medium Voltage Maintenance
Term Contract
Post-Bid

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

Advanced Contract Initiative (ACI) Temporary Emergency Power (TEMP)
Results

Miscellaneous Electrical Work
Results
Lake Placid, NY

Electrical Switchgear Testing and Maintenance
Term Contract
Post-Bid
Mineville, NY

UPS Preventive Maintenance
Term Contract
Results
Elizabethtown, NY

Whiteface Electrical Switchgear and Cabling
Post-Bid
$10,000 to $500,000 est. value
Wilmington, NY

Generator Maintenance in Clinton, Essex, Franklin, Hamilton, and St. Lawrence Counties
Term Contract
Results

Generator Maintenance
Term Contract
Post-Bid
Au Sable Forks, Jay, NY 12941

Electrical Switchgear Testing
Term Contract
Results
Ray Brook, NY

LED Lights
Term Contract
Post-Bid
Elizabethtown, NY 12932

1980 Rink Lighting Upgrade
Results
Lake Placid, NY 12946

Olympic Sports Complex - Phase II Electrical Upgrades
Post-Bid
Less than $1,300,000 est. value
Lake Placid, NY 12946

Weatherization & Energy Services
Term Contract
Post-Bid
NY 12932

Last Updated 06/14/2019 08:09 AM
Project Title

Gore Base Lodge Electrical Improvements

Physical Address View project details and contacts
City, State (County) Lake Placid, NY 12989   (Essex County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Provide a new 300kVA 4.8kV/480V pad mounted service transformer on an existing transformer vault in place of an existing transformer located at the Lift Number #8 Base Reconnect the exiting primary cables and secondary cables to the new transformer Provide a new 4.8kV feeder extension, underground in conduit, from the existing transformer vault at Lift #8 Base to a location approximate 350 feet away near Northwood Lodge and lift 3 – all distances for conduit and wire are bidders responsibility Provide and install new 4.8kV terminations on both ends of the new 4.8kV feeder cable, including grounding of the shield wires. Provide and install a new transformer vault, ground ring, ground rods and conduits at a location near lift 3 and the Northwood Lodge building Relocate the transformer from Lift #8 Base to the new vault and install on vault Provide and install new secondary service to the existing lift 3 including a new fused disconnect switch (near transformer), secondary conduits and secondary cables, approximately 30 ft away - all distances for conduit and wire are bidders responsibility Provide and install a new secondary service to the existing Northwood Lodge electrical room including a new fused disconnect switch (near transformer), secondary conduits and secondary cables approximately 170ft away. Full description of work is covered in the Technical Specification Write-up and associated Drawings - all distances for conduit and wire are bidders responsibility.
Details
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Raceway and Boxes for Electrical Systems, Conduit for Electrical Systems, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents