Similar Projects
South GA Apron Rehabilitation
Post-Bid
Bemidji, MN 56601

Red Wing Regional Airport - 2021 Apron Expansion (RWING 159685)
Post-Bid
Red Wing, MN

Taxiway Rehabilitation
Results
Milaca, MN 56353

2021 Taxiway A/B and G Apron Reconstruction
Results
$20,000,000 to $23,000,000 est. value
Minneapolis, Saint Paul, MN

2021 Taxiway and Apron Reconstruction/Apron Expansion and Hangar Taxilanes
Post-Bid
Fertile, MN

Airfield Pavement Maintenance
Results
$472,346 est. value
Buffalo, MN

Airfield Pavement Maintenance and Reconstruction
Results
Sauk Centre, MN

South Taxilanes Construction
Results
Le Sueur, MN

Terminal Area and Apron Pavement Rehabilitation
Results
Winsted, MN

Konshok Field Terminal Area Taxilanes
Results
$1,135,000 est. value
Park Rapids, MN 56470

2021 Pavement Improvements
Results
$50,000 est. value
Bemidji, MN 56601

Terminal Apron Rehabilitation - Phase II
Results
$839,000 est. value
Bemidji, MN 56601

2021 Miscellaneous Airfield Improvement
Results
$1,475,000 est. value
MN

2021 Taxilanes Pavement Reconstruction
Results
$534,300 est. value
Blaine, MN 55449

2021 Airport Improvements
Results
$2,700,000 to $3,150,000 est. value
Mankato, MN 56001

Last Updated 07/29/2021 09:03 AM
Project Title

2021 Runway 14/32 Replacement Phase 3

Physical Address View project details and contacts
City, State (County) Lake Elmo, MN 55042   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,468,970
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major Work Items Include:Pavement removal, excavation and embankment, grading, geotextile fabric, granular borrow, P-208 aggregate base, P-401 bituminous pavement, culvert pipe installation, storm pond grading and mechanical evaporator installation, pavement markings, runway and taxiway lighting, airfield signage, precision approach path indicator (PAPI) installation, runway end identifier lights (REIL) installation, electrical vault building, and turf establishment

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents