Similar Projects
Retaining Wall Improvements
Infrastructure
Bidding
Upper Saint Clair, PA

Werner Street Slope Stabilization and Retaining Wall Improvements
Infrastructure
Bidding
Bridgeville, PA 15017

Corrugated Metal Pipe
Post-Bid
Pittsburgh, PA 15123

Semicir Street Landslide Remediation
Post-Bid
Pittsburgh, PA 15214

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Saw Mill Run Maintenance Project
Infrastructure
Bidding
Pittsburgh, PA

Reinforced Concrete Products
Post-Bid
Monroeville, PA

Waterworks Park Reservoir Liner and Cover Replacement
Results
$200,000 est. value
Sewickley, PA 15143

Malabar Road Culvert Repair
Infrastructure
Bidding
Pittsburgh, Plum, PA 15239

Cowley Park Landslide Remediation
Post-Bid
Pittsburgh, PA 15219

Municipal Building Stormwater Pond
Results
Presto, PA 15142

Bairdford Park Master Plan Construction B-1 Ballfield Project
Post-Bid
$85,000 est. value
Cheswick, PA 15024

Bridge Demand MTC 12, 20
Results
$1,000,000 to $2,499,999 est. value

Combined Sewer Overflow Debris Control
Post-Bid
$30,000 est. value
Etna, PA 15223

Last Updated 07/16/2021 04:38 PM
Project Title

Plum Creek Stream Bank Stabilization

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $77,500
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project generally consists of, but may not be limited to, demolition and removal of existing manhole and abandoned 24 inch sewer line, construction and installation of gabion stream bank protection, grading, excavating, erosion and sedimentation control, provide and install all measures required to restore all areas disturbed by construction, and all other items necessary to provide a complete and finished project according to the Contract Drawings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents