Similar Projects
Syracuse University Link Hall Room 019 Laboratory
Renovation, Addition
Construction
Syracuse, NY 13202

Construct Surge Space Illick and Moon at SUNY ESF
Results
$1,000,000 to $2,500,000 est. value
Syracuse, NY 13210

Replace Fire Extinguishing System, Chemical Storage Building
Results
Syracuse, NY 13210

Regional Job Order Contract - Syracuse Region
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
NY

Emergency Department Psych Renovations Community Campus
Renovation
Results
$300,000 to $700,000 est. value
Syracuse, NY

Victory Court at Syracuse University
Addition
Conception
Syracuse, NY 13210

Schine Student Center
Renovation - 55,000 SF
Design
Syracuse, NY 13204

3N Scope Reprocessing
Renovation, Demolition
Results
Syracuse, NY 13210

Renovate Marshall Hall at SUNY ESF
Renovation
Results
$30,000,000 to $35,000,000 est. value
Syracuse, NY 13210

UUH Nuclear Camera Replacement
Renovation
Post-Bid
Syracuse, NY 13210

SU Sadler Hall Elevator Modernization 2020
Renovation
Construction
$330,400 est. value
Syracuse, NY 13210

UCH Renovate Nuclear Camera Room
Renovation
Results
Syracuse, NY 13215

4W Office Relocation
Renovation
Results
Syracuse, NY 13215

Construction Manager Term Agreement - South Region
Term Contract
Post-Bid

Construction Manager Term Agreement - North Region
Term Contract
Post-Bid

Last Updated 10/16/2020 09:56 AM
Project Title

University Hospital – 5E Sterile Processing Renovation

Physical Address View project details and contacts
City, State (County) Syracuse, NY 13210   (Onondaga County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes all necessary labor, materials and equipment as specified and as indicated for renovation of the existing OR central sterilization suite at University Hospital. The suite is comprised of a decontamination room and a sterile preparation and packaging room. The suite will be expanded into adjacent existing spaces and a new anteroom will be added to the decontamination side of the suite. The work includes demolition and construction of interior walls; new floor, wall and ceiling finishes; new doors; new casework and counters; modifications to HVAC ductwork; replacement of existing mechanical equipment; re-location and addition of electrical outlets, power supplies and lighting; domestic and RO water piping, DWV piping, compressed air and medical gas lines; installation of owner-provided equipment; and furnishing and installation of all other contractor-provided equipment. State University of New York also has a goal for the Work Force participation: EEO 10% WBE and EEO 10% MBE of total work force on the project.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents