Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Sidewalk and Curb Repair / Grinding
Infrastructure
Bidding
$90,000 CJ est. value
Morristown, TN 37814

Design and Construction of New Road
Infrastructure
Post-Bid
Morristown, TN

Thompson Creek Road Construction
Infrastructure
Post-Bid
Morristown, TN 37813

Paving at Development TN38-007
Infrastructure
Results
Morristown, TN 37813

Paving at Pine Cone / Main Office
Infrastructure
Results
$75,000 est. value
Morristown, TN

Fire Department Training Facility
New Construction, Infrastructure
Bidding
$170,000 CJ est. value
Morristown, TN 37813

SWC 504 Winter Road Maintenance
Term Contract
Post-Bid
$1,971,195 est. value

Lincoln Heights ES Site Work
Infrastructure
Results
Morristown, TN 37813

Cheatham Stoplog Concrete Storage Slab
Term Contract, Infrastructure, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value

Resurfacing on U.S. 11E, S.R. 92, S.R. 341
Infrastructure
Results
$300,000 est. value
Morristown, TN

Elevator Service, Paint, Playground Mulch, Garage Pickup & Practice Fields Resodding
Renovation, Term Contract
Post-Bid
Morristown, TN

Resurfacing on S.R. 113
Infrastructure
Results
$10,000,000 to $250,000,000 est. value
Russellville, TN 37860

RFP - Purchase and/or Redevelopment of the Old Fire Station No. 4
Demolition, New Construction, Infrastructure
Post-Bid
$1,600,000 CJ est. value
Morristown, TN 37814

2022 Site Improvements at Multiple School Sites
Infrastructure
Post-Bid
Morristown, TN

Last Updated 01/03/2023 06:35 AM
Project Title

Slope Stabilization U.S. 25E

Physical Address View project details and contacts
City, State (County) Morristown, TN 37814   (Hamblen County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,330,894 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project No. 29004-4247-04 (PIN 129455.00) The slope stabilization on U.S. 25E (S.R. 32) near the Pyrite Encapsulation Site at L.M. 7.2. Project Length - 0.123 miles Completion Time - On or before 5/31/2023 Each bid must be accompanied by an electronic bid bond or a Cashier's or Certified Check made payable to the Department of Transportation, or Irrevocable Letter of Credit naming the Department as beneficiary (for Mowing and Litter projects only), in an amount equaling not less than five percent (5%) of the amount bid. A Prime Contractor must prequalify with The Department of Transportation in accordance with Tennessee Code Annotated 54-5-117 and Tennessee Department of Transportation Rule 1680-5-3, Prequalification of ontractors, before bid authorization for highway contracts will be furnished. Prime contractors, except mowing and litter removal contractors, are required to be licensed with the State of Tennessee, Department of Commerce and Insurance (TDCI), Board for Licensing Contractors (BLC). Prime contractors must be licensed in the general classification (e.g. Heavy Construction (HC), Highway, Railroad, Airport Construction (HRA), Specialty (S), Municipal and Utility Construction (MU), or Electrical Contracting (CE)) for the type of work in the project which they will perform. Bidders may submit a Proposal without having a license and will be considered for award for twenty-one (21) days after Proposals are opened. If the Bidder does not have a license with the TDCI, on or before twentyone (21) days after Proposals are opened, the Bidder will be considered non-responsive and their Proposal will be rejected. All questions related to the Proposal Contract, Plans, Specifications or Special Provisions shall be directed to the Headquarters Construction Office (615-741-2414). Information received from other offices of the Tennessee Department of Transportation is strictly advisory The Department encourages the use of disadvantaged business enterprises on all contracts. TNDOT - 029 - Slope Stabilization U.S. 25E

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents