Similar Projects
J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Design
Hines, IL 60141

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

Heating Small Construction Repairs in the Emergency Heating Repair Program - JOC
Term Contract
Post-Bid
Less than $1,800,000 est. value
Chicago, IL 60602

HVAC Maintenance
Term Contract
Results
Riverdale, IL 60827

Ionization System Installation
Results
Lincolnwood, IL 60712

Service Contract for Heating, Ventilating, Air Conditioning and Temperature Controls
Term Contract
Post-Bid
Calumet City, IL 60409

Chiller Compressor Replacement at Explorers ES
Results
Chicago, IL 60632

Boiler 1 And 3 At Dusable High School
Post-Bid
Chicago, IL 60615

Chiller Repair at Sandoval Elementary School
Results
Chicago, IL 60629

FSCC Chiller Maintenance
Post-Bid
Chicago, IL 60608

South School Geothermal and HVAC Upgrades
Results
Less than $727,870 est. value
Glencoe, IL 60022

RTU HVAC System Improvements
Post-Bid
Maywood, IL 60153

Pneumatic Control System at Burnside Elementary School
Results
Chicago, IL 60619

Abb Hvac Drivers
Term Contract
Post-Bid
Chicago, IL 60612

Kitchen Hood Installation at Kilmer Elementary School
Results
est. value
Chicago, IL 60626

Reported 01/27/2022 12:00 AM
Project Title

MTC Training Trailers Air Filtration System

Physical Address View project details and contacts
City, State (County) Chicago Heights, IL 60411   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Air filtration System (2 units) for mobile training units (53’ training trailers) Quantity 2 Specifications are as follows: Product delivery and installation of a laboratory grade HEPA air filtration system to be installed in two (2) MTC trailers with minimum specifications as follows: • Air filtration system must adequately provide independent coverage for two 50-foot training trailers. • The air filtration systems should continually clean air within the confined space of each training trailer. • The air filtration system should pull contaminated air and continually replace with clean air. • The air filtration system should utilize a laboratory-grade HEPA filtration system with ability to clean air of the human coronavirus and similar airborne infectious viruses. • Bid price should include installation and appropriate equipment and installation warranties.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents