Similar Projects
Middle School Locker Replacement
Renovation
Bidding
$125,000 est. value
Montrose, MI 48457

High School Additions and Remodeling
Renovation, Addition
Post-Bid
Swartz Creek, MI 48473

High School East and West Campus Renovations
Renovation
Post-Bid
Grand Blanc, MI 48439

Erwin L. Davis Education Center Renovation Phase 5
Renovation
Results
Less than $140,000 est. value
Flint, MI 48507

2021 Middle School Gym Improvements
Renovation
Results
Fenton, MI

Dutton Christian School - Addition
Addition - 9,000 SF
Construction
Caledonia, Gaines, MI 49316

Grand Blanc Community School District High School East and West Shower Stall Renovations
Renovation
Post-Bid
Grand Blanc, MI 48439

Construction Management Services
New Construction
Results
Flint, MI

2021 Sinking Fund Project
Renovation
Post-Bid
Flushing, MI

Linden Community Schools - Bid Package No. 03B: Clocks/Bells/PA System
New Construction
Results
$400,000 est. value
Linden, MI

East and West Middle School Media Center Renovations
Renovation
Post-Bid
Grand Blanc, MI 48439

Multi Purpose Building Bid 1
Renovation
Post-Bid
Linden, MI 48451

Athletic Complex Bid Pack No.3
New Construction
Post-Bid
Grand Blanc, MI 48439

2021 New Classrooms at Hamady High/Middle School
New Construction
Post-Bid
Flint, MI 48504

GBCS HS East Media Center Renovations
Renovation
Post-Bid
Grand Blanc, MI 48439

Reported 06/08/2022 12:00 AM
Project Title

2022 Keyser Project RFQ

Physical Address View project details and contacts
City, State (County) Flint, MI 48504   (Genesee County)
Category(s) Commercial, Education
Sub-Category(s) Middle/Senior High School, Office
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Board of Education of Westwood Heights School District is accepting firm, sealed proposals for creating a new conference room from two smaller rooms and the construction (5) five new offices within the large classroom on the east side of the Keyser Building located at 3425 W. Pierson Rd. The Contract for this project will be direct with the Owner, Westwood Heights School District. Overall administration of the project will be the responsibility of the Project Manager. The owner will award the contract to the successful bidder within 30 days of the Bid Due date. All bids will be submitted on forms provided in the Contract Specifications. Facsimile bids will not be accepted Each bidder shall submit bid bond in the amount of 5% of the amount of the bid. All questions regarding the bidding procedures and specifications are to be directed to tclontz@hamadyhawks.net at Westwood Heights Schools before 2:00 p.m., Friday, June 3, 2022. Request documents via email at bennis@hamadyhawks.net. All bidders must provide familial disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or the employee of the bidder and any member of the school district board, superintendent, or employee of the school district. No bid will be accepted that does not include this sworn and notarized disclosure statement. The Owner reserves the right to reject any and all proposals, award the bid to other than low bidder and to waiver informalities, irregularities, and/or errors in the bid proposals, which the Owner feels to be in its best interest.

Details

Office, New Construction, Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Furniture, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents