Similar Projects
Intersection Improvements: Grading, Paving, Drainage, Culvert, and Lighting Intersection
Post-Bid
NC

Ramblewood Drainage Improvements Project
Post-Bid
Raleigh, NC

Restoration of Concord Streams in Concord, NC
Results
$1,000,000 to $5,000,000 est. value
Concord, NC

7115 Pleasant Grove Road Drainage Improvements
Results
Charlotte, NC

Sam`s Branch Phase II Greenway/North O`Neil Crossing
Post-Bid
Clayton, NC

Mccotter Canal Utility Access Stabilization
Results
Less than $757,826 est. value
Havelock, NC

Brightwater Drive Extension Phase 2A
Post-Bid
Lillington, NC 27546

Coastal Storm Risk Management at Carolina and Kure Beach, North Carolina
Results
$10,000,000 to $25,000,000 est. value
Carolina Beach, NC

Marine Science Fisheries Research Lab
Post-Bid
Morehead City, NC 28557

Roxie Avenue Drainage Improvements Phase I
Results
Fayetteville, NC 28301

Playground Surfacing and Drainage Work
Post-Bid
Durham, NC

Stream Bank Repair (Horne Creek) at Pilot Mountain State Park
Results
NC 27043

Stormwater Project and Connector Trail
Post-Bid
Sparta, NC 28675

Parkers Canal Stream Stabilization
Results
Less than $493,638 est. value
Rocky Mount, NC 27801

Dorothea Drive Drainage Improvements (Formal)
Post-Bid
Raleigh, NC

Last Updated 12/14/2018 03:42 PM
Project Title

Holly Ridge Road Drainage Improvements

Physical Address View project details and contacts
City, State (County) High Shoals, NC   (Gaston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project consists of 600 LF of ditch stabilization, 344 LF of 18 inch RCP and associated drainage structures, the installation of 220 LF of steel beam guardrail, including all materials and appurtenances and other related work.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents