Similar Projects
Additions, Alterations and Renovations at Northern Burlington County Regional High School – Phase 1
Renovation
Results
$2,500,000 est. value
Columbus, NJ 08022

Construction Management Services
Post-Bid
Delran, NJ 08075

Security Office and Exterior Bollards
Results
Less than $160,000 est. value
Vincentown, NJ 08088

Renovations at the Rancocas Valley Regional High School District Annex
Renovation
Results
$1,570,185 est. value
Mount Holly, NJ

Lenape Regional High School District Office VRF Installation
Results
Shamong, NJ 08088

Riverside High School and Middle School Alterations - General Construction
Bidding
Riverside, NJ 08075

New Greenhouse at Northern Burlington County Regional High School
New Construction
Results
$700,000 est. value
Mansfield, NJ 08022

Maple Shade High School Renovations and Additions
Renovation, Addition
Construction
$14,815,000 est. value
Maple Shade, NJ 08052

Addition, Alterations and Renovations at Northern Burlington County Regional High School - Phase 3
Renovation
Results
$15,480,000 est. value
Columbus, NJ 08022

Garfield Park Academy Addition
Addition
Post-Bid
Willingboro, NJ 08046

Thomas Hopkins Art Room and Guidance Office Renovation
Renovation
Bidding
Burlington, NJ 08016

Ashbrook Elementary and Lumberton Middle School Renovations
Renovation
Construction
Lumberton, NJ 08048

Pre-Kindergarten Restrooms Alteration Located at Mildred Magowan School
Renovation
Results
Less than $390,000 est. value
Edgewater Park, NJ 08010

Bid Package No. 1 Renovations/Alterations to Countryside, Harrington, Hartford, Hillside, Parkway and Springville Schools; Bid Package No. 2 Addition/Alterations/Renovations to Fleetwood and Larchmont Schools
Renovation
Construction
Mount Laurel, NJ 08054

Disaster Recovery Services
Results

Last Updated 05/20/2020 08:27 AM
Project Title

Rancocas Valley Regional High School Guidance Suite, Toilet Rooms and Door Renovations

Physical Address View project details and contacts
City, State (County) Mount Holly, NJ   (Burlington County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced May 2020
Bids Due View project details and contacts
Estimated Value $1,938,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work consists of renovations to three buildings at the District’s Main High School Campus. Areas to be renovated include the Guidance Office Suite, Student & Staff Toilet Rooms and Corridor Door assemblies. Work in the Guidance Suite includes new wall partitions, interior windows, doors & frames, casework & equipment, lay-in ceilings, HVAC packaged rooftop unit, fin tube radiation, VAV systems, lighting, fire alarm and room finishes. Work in the Toilet Rooms includes new plumbing fixtures, toilet accessories, toilet partitions, fluid applied flooring, lay-in ceilings, lighting, fire alarm, hand dryers and room finishes. Work in the corridors includes door, frame and hardware replacement. Limited Structural framing will be provided to accommodate the renovations and new rooftop equipment. Electrical systems include new panels, feeders and circuits to support the renovations with power, lighting, fire alarm, and HVAC equipment. Project work also includes abatement of asbestos VAT flooring. Refer to the construction drawings and specifications for a complete scope of work. The project also includes Alternate Bid #1 scope of work for new flooring, ceilings, lighting and hand dryers in four student toilet rooms (Rooms C-1-5, C-1-7, C-2-5 & C-2-7) as indicated on the drawings and in specification section “Bid Form – Part C – Alternates”. Refer to the construction drawings and specifications for a complete scope of Alternate Bid # 1 work.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents