Similar Projects
Maroa-Forsyth Middle School
Addition
Results
Maroa, IL 61756

Toilet Room Remodel at McGaughey Elementary School
Renovation
Post-Bid
Mount Zion, IL 62549

Montessori Door and Window Replacement
Post-Bid
Decatur, IL 62521

Muffley Elementary School Secure Entry
Results
Decatur, IL 62521

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Construction
Less than $4,200,000 est. value
Argenta, IL 62501

Door and Window Replacement for Pershing ELC and South Shores ES
Alteration
Results
Decatur, IL

American Dreamer Stem Academy New Gymnasium And Renovations
New Construction, Renovation, Addition - 76,893 SF
Bidding
Decatur, IL 62521

Summer 2021 Site Work
Results
Decatur, IL 62521

Overhead Door Replacement at Fire Station 2
Results
Decatur, IL 62521

Athletic Outbuilding
New Construction
Results
$450,000 est. value
Argenta, IL 62501

2022 Roof Repairs And Replacements
Alteration
Results
Decatur, IL 62522

2022 Roof Repairs And Replacements
Alteration
Results
Decatur, IL 62522

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Overhead Door Repairs
Infrastructure
Bidding
Decatur, IL

Summer 2021 Site Work
Results
Decatur, IL 62521

Last Updated 03/29/2022 02:50 PM
Project Title

HLS Summer 2022 Project

Physical Address View project details and contacts
City, State (County) Warrensburg, IL 62573   (Macon County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Middle/Senior High School, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the replacement of select doors, frames, and hardware within the Middle and Elementary School and associated work. Work will be coordinated with that of an asbestos abatement project under a separate contract. WORK INCLUDES A. Work covered by contract documents includes the replacement of select doors, frames, and hardware at both the W-L Middle School and Elementary School. Work also includes infilling of a basement door opening and adjacent basement exterior stairway. B. The owner is paying for a portion of this work under a maintenance grant. The grant requires that a portion of the project is billed and paid in full before July 1, 2022. Once the project is awarded, the Architect, Owner, and Contractor will discuss payment of materials, stored or onsite by the grant deadline.

Details

Middle/Senior High School, Renovation, Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 07 - Thermal and Moisture Protection, Sheet Waterproofing, Self-Adhering Sheet Waterproofing, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Panel Doors, Sectional Doors, Hardware, Glazing.
Division 09 - Finishes, Painting and Coating.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents