Similar Projects
Wooten Farm Residential Development
New Construction, Infrastructure
Conception
$65,400,000 CJ est. value
Winston-Salem, NC 27284

U-Haul - East Broad Street / Statesville
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Statesville, NC 28625

Massey Chapel Road Townhomes
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Durham, NC 27713

Mockingbird Lane and Sherron Road Townhomes
New Construction, Infrastructure
Conception
$47,000,000 CJ est. value
Durham, NC 27701

Sewage Lift Station Rehabilitation & Upgrades - Brunswick County
Infrastructure
Conception
$2,800,000 est. value
Bolivia, NC

Coddle Creek Tributary Outfall Near Concord Parkway South - City of Concord
Infrastructure
Conception
$4,746,000 est. value
Concord, NC 28025

Transmission Midway Road To West Brunswick Treatment Facility - Brunswick County
Alteration
Conception
$29,320,000 est. value
Bolivia, NC 28422

Miami Church Road 12"/24" Parallel Water Line Extension - US Highway 601 To Cold Springs Road - City Of Concord
Infrastructure
Conception
$7,718,000 est. value
Concord, NC 28025

Cross Country 16" Water Line Extension - NC Highway 49 To Rocky River Road - City Of Concord
Infrastructure
Conception
$2,995,000 est. value
Concord, NC 28025

Academy Recreation Center/Gibson Village Complex Development - Phase I - City of Concord
New Construction, Renovation, Infrastructure
Conception
$1,190,000 est. value
Concord, NC 28025

Coddle Creek Tributary Outfall Extension From Us Highway 29 To Rock Hill Church Road - City Of Concord
Alteration
Conception
$1,587,000 est. value
Concord, NC 28027

South Development Apron Expansion Phase 2 - City of Concord
Renovation, Infrastructure
Conception
Less than $10,904,589 est. value
Concord, NC 28027

Poplar Tent Road Widening - East of I-85 to George Liles Boulevard - City of Concord
Alteration
Conception
$2,003,000 est. value
Concord, NC 28026

Rocky River Tributary Outfall To Near John Q. Hammonds Drive - City Of Concord
Alteration
Conception
$1,554,000 est. value
Concord, NC 28025

100 KV Tie Line-Liles Boulevard to Sub O - City of Concord
New Construction, Infrastructure
Conception
$3,570,000 est. value
Concord, NC 28027

Last Updated 01/20/2023 09:31 PM
Project Title

Airfield Drainage Improvements Phase I

Physical Address View project details and contacts
City, State (County) Washington, NC 27889   (Beaufort County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,605,784 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

** As of January 20, 2023 , this project has not yet been awarded. The project is expected to be awarded on January 10, 2023.** The project shall consist of furnishing all labor, materials, and equipment and performing all work required to satisfactorily complete the Airfield Drainage Improvements project. Items of work include removal and replacement of existing drainage structures, drainage pipe, slip line existing concrete pipe, and regrading of infield swales. Each bid must be accompanied by a Bid Bond, a deposit of cash or by a certified check payable to City of Washington,102 East Second Street, Washington, NC 27889, and drawn on some bank or trust company authorized to do business in the State of North Carolina, for an amount equal to 5% of the total base bid, as a guarantee that if the bid is accepted, the required Contract will be executed and the required Performance Bond and Payment Bond furnished within fifteen (15) days after receipt of written notice of formal award of Contract. Each bidder for this project shall be registered as a prequalified bidder with the NCDOT at the time of bid opening. All subcontractors for the project should be registered as a pre-qualified subcontractor with the NCDOT at the beginning of the project. The proposed Contract for this project is subject to the Minority Business and Women Business Enterprise Program Bid Conditions contained in Appendix C and to the Federal Contract Provision Requirements contained in Appendix D of the Contract Documents. Prospective bidders should read the instructions for preparing bids in Section 20 of the project specifications carefully before submitting their bids. The City of Washington, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award The City of Washington hereby notifies all bidders that in regard to any contract entered into pursuant to this advertisement, that the bidder shall make good faith efforts, as defined in Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract 8.0% (Combined Goal) of the dollar value of the prime contract for each project or schedule of work to Minority Business Enterprises (MBE) and Women Business Enterprises (WBE). Only firms certified as an MBE/WBE by the NCDOT Unified Certification Program may be applied to the goal. In the event that the bidder for this solicitation qualifies as a MBE/WBE the contract goal shall be deemed to have been met. Individuals who are rebuttably presumed to be socially and economically disadvantaged include women, Black Americans, Hispanic Americans, Native Americans, Asian-Pacific Americans, and Asian-Indian Americans. The apparent successful competitor will be required to submit with the bid information concerning the MBE/WBEs that will participate in this contract. The information will include the name and address of each MBE/WBE a description of the work to be performed by each named firm, and the dollar value of the contract. If the bidder fails to achieve the contract goal stated herein, it will be required to provide documentation demonstrating that it made good faith efforts in attempting to do so. A bid that fails to meet these requirements will be considered nonresponsive. All proposals shall be prepared on the basis of the Minimum Wage Rates as established by the Secretary of Labor and as included in Appendix D of these specifications. It is the intent of the City of Washington to award all schedules of work; however, the award of this contract is contingent upon the availability of Federal, State, and Local funds. The City of Washington reserves the right to reject any or all proposals. Questions shall be submitted in writing no later than Friday, December 2, 2022 at 1:00 PM.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents