Similar Projects
Albemarle Intersection Bundling
Post-Bid
VA

Y--P588 Fuller Road Improvements, MCB, Quantico, VA
Results
$5,000,000 to $15,000,000 est. value
Quantico, VA

Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

C & G Intersection Upgrades DSCR Richmond, VA
Results
$500,000 to $1,000,000 est. value
Richmond, VA 23297

East Main Street Pedestrian Improvements (Phase II)
Results
Wise, VA

Smart Scale - Intersection Radius Improvement
Results
Less than $165,000 est. value
VA

George Washington Memorial Parkway
Results
Arlington, VA

Poplar Road Curve Improvement Project
Results
Stafford, VA

Jahnke Road Improvements (UPC 19035)
Results
Richmond, VA

Cook Road Shoulder Widening Project
Results
Yorktown, VA

Falling Branch Intersection Improvements
Results
Christiansburg, VA

Street Construction Improvements
Results
$1,363,000 est. value
Arlington, VA 22201

27th Street South and Crystal Drive Lane Conversion
Results
$2,155,423 est. value
Arlington, VA

Wythe Creek Road Milling and Repaving
Results
Poquoson, VA

Realignment of Colonial Avenue
Results
Suffolk, VA

Last Updated 12/20/2018 01:04 AM
Project Title

High Friction Surface Treatment Paving

Physical Address View project details and contacts
City, State (County) State-Wide: VA
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $925,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 0010 00100 Mobilization Lump Sum Lump Sum 513 0020 15309 Pavement High Friction Surface Treatment Sy 29,515.200 Attd 0030 24265 Maintenance Of Traffic Location No. 11 Lump Sum Lump Sum Attd 0040 24265 Maintenance Of Traffic Location No. 14 Lump Sum Lump Sum Attd 0050 24265 Maintenance Of Traffic Location No. 15 Lump Sum Lump Sum Attd 0060 24265 Maintenance Of Traffic Location No. 2 Lump Sum Lump Sum Attd 0070 24265 Maintenance Of Traffic Location No. 25 Lump Sum Lump Sum Attd 0080 24265 Maintenance Of Traffic Location No.7n Lump Sum Lump Sum Attd 0090 24265 Maintenance Of Traffic Location No.7s Lump Sum Lump Sum Attd 0100 54106 Eradicate Exist. Nonlinear Pvmt Mrkg Sf 6.000 512 0110 54573 Pvmt Symb Mrkg Sgl Turn Arrow Ty a Ea 1.000 704
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents