Similar Projects
Photovoltaic Systems and Associated Equipment Maintenance, Repair, and Upgrade
Alteration
Post-Bid
$343,000 est. value

Four (4) 250KVA Stepdown Overhead Transformers and Four (4) 333KVA Stepdown Overhead Transformers
Alteration
Post-Bid
Taunton, MA

115Kv Switchyard Site and Electrical Installation Work
Alteration
Results
$3,000,000 est. value
Taunton, MA 02780

New PFAS Facility, Cate Springs Well - Sub Bid
Alteration
Results
$450,000 est. value
Mansfield, MA

50KVA Single Phase Padmount Transformers
Alteration
Post-Bid
Taunton, MA

Miscellaneous Electrical, Data and Security Upgrades for the Freetown Police Station
Alteration
Results
$24,000 est. value
Freetown, MA 02717

Dion Chiller Replacement - Sub Bid
Alteration
Post-Bid
$1,392,000 est. value
Dartmouth, MA

Community Center Upgrades at the Elise Circle Development 667-1 - Filed Sub- Bids
Alteration
Results
$215,087 est. value
North Easton, MA

Pole Mount Transformers
Alteration
Post-Bid
Taunton, MA 02780

Harold H. Galligan School Window, Exterior Door and Boiler Replacement Project - Sub-Bids
Alteration
Results
$1,350,000 est. value
Taunton, MA 02780

Weatherization And Electrical Work
Term Contract
Post-Bid
Fall River, MA 02724

Walsh Well PFAS Treatment, Plant Upgrades - Sub Bids
Alteration
Results
$6,000,000 est. value
Mansfield, MA 02048

Electrical Contract Services for Maintenance and Repairs in School Buildings
Alteration
Post-Bid
Somerset, MA

Fall River Public Library Boiler Replacement - Sub Bid
Alteration
Results
$350,000 est. value
Fall River, MA 02720

Circuit E-16 Materials
Term Contract
Post-Bid
North Attleboro, MA 02760

Last Updated 06/07/2023 09:35 AM
Project Title

E.D. Sherman Substation 115 Kv Equipment Upgrade

Physical Address View project details and contacts
City, State (County) North Attleboro, MA 02760   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor is to furnish, deliver, install and connect, and make ready for operation all material and equipment furnished by the Owner and the Contractor as shown on the Plans and Specifications. All else remaining as indicated on the drawings becomes part of this Contract. This project will replace two 115 kV oil circuit breakers, 115 kV revenue metering instrument transformers and 115 kV disconnect switches and associated buswork. The work will progress in four phases: 1. Phase 1 - Preliminary Work a. Installation of two relay panels, five (5) meter sockets, two (2) white indicating lights, direct buried conduit, precast handhole. All existing substation equipment will remain energized during this phase. 2. Phase 2 - 115 kV Bus 3 Outage a. Removal and proper disposal of one 115 kV oil circuit breaker, five 115 kV revenue metering instrument transformers, one 115 kV gang operated disconnect switch and associated buswork, equipment support structures, foundations, conduit and cabling. b. Installation of one 115 kV circuit breaker, two 115kV motor-operated disconnect switches, three 115 kV metering units including associated foundations, structures, conduit, cabling, grounding and buswork. 115 kV Bus 1, 115 kV Bus 2, Transformer T1, Transformer T2 and the existing 13.8 kV distribution equipment will remain energized during this phase. 3. Phase 3 - 115 kV Bus 1 Outage a. Removal and proper disposal of existing control house, one 115 kV oil circuit breaker, five 115 kV revenue metering instrument transformers, one 115 kV gang operated disconnect switch and associated buswork, equipment support structures, foundations, conduit and cabling. b. Installation of one 115 kV circuit breaker, two 115kV motor-operated disconnect switches, three 115 kV metering units including associated foundations, structures, conduit, cabling, grounding and buswork. 115 kV Bus 2, 115 kV Bus 3, Transformer T2, Transformer T3 and the existing 13.8 kV distribution equipment will remain energized during this phase. The Contractor shall reach substantial completion on or before May 31, 2024, and final completion on or before July 15, 2024. The Contractor shall attain the following interim Milestone dates during construction: 115 kV Bus No. 3 ready for energization - December 31, 2023. 115 kV Bus No. 1 ready for energization - May 31, 2024.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents